How to apply for a building permit in Town of Gorham, Maine. Permit authority, application steps, fees, and inspection requirements.

Code adoption
MUBEC; 2021 I-codes effective April 7, 2025.
Last verified
April 2026
On this page 6
§ 01

Permit authority

Community Development -- Code Division

Street address
Gorham Municipal Center, 75 South Street, Gorham, ME 04038
Coverage
Town of Gorham municipal limits. Code Division handles building, electrical, plumbing, and land use permits.
Online portal
Permit Portal
Additional resources
§ 02

When a permit is required

Permit triggers and exempt work for Gorham

For construction, structural alteration, addition, relocation, or demolition; electrical and plumbing work require separate permits.

Ordinary maintenance not involving structural change
Painting and similar finish work
  • Exempt Ordinary maintenance not involving structural change
  • Exempt Painting and similar finish work

Note: Refer to MUBEC Section 105.2 for complete list.

Required documents
  • Completed application
  • site plan
  • construction drawings
  • energy compliance documentation. CEO may require engineer/surveyor certifications.
Building code
MUBEC; 2021 I-codes effective April 7, 2025.
Owner-builder
Not detailed; contact department.
Contractor requirements
State-licensed electrician and plumber required for trade permits.
§ 03

Application process

Application → plan check → issuance → inspection → final

  1. 01
    Download applicable permit application from gorhammaine.gov or pick up at 75 South Street.
  2. 02
    Complete application; include site plan and construction drawings as required.
  3. 03
    Bring application to Code Enforcement Office for review.
  4. 04
    Code Enforcement Officer may request additional information (engineer or surveyor certifications as needed).
  5. 05
    Applicant or designee presents payment at Code Enforcement Office; permit released.
  6. 06
    Post permit at job site.
  7. 07
    Schedule required inspections (by appointment only).
  8. 08
    Final inspection and project close-out.

Source: Community Development -- Code Division ↗

§ 04

Fee schedule

Gorham building permit fees

Fee type
Amount
01
Minimum permit fee
Not fully specified; submeter permit: $50.00; re-inspection fee: $50.00.
02
Permit fee formula
Not fully detailed in public sources; contact department.
03
Reinspection fee
Re-inspection fee: $50.00.

Payment made at Code Enforcement Office in person.

§ 05

Required inspections

Scheduling and sequence

How to schedule
  • 207-222-1605 (phone)
Inspection hours
Municipal Center business hours; contact for schedule.

Typical sequence: Foundation, framing, rough-in trades, insulation, final

Re-inspection fee: $50.00.

Source: Community Development -- Code Division ↗

§ 06

Frequently asked

Common questions about Gorham permits

01 Do I need a building permit in Gorham, ME?
For construction, structural alteration, addition, relocation, or demolition; electrical and plumbing work require separate permits.
02 How much does a building permit cost in Gorham, ME?
Building permit fees in Gorham, ME are set by the local building department and vary by project type and valuation. The minimum permit fee is Not fully specified; submeter permit: $50.00; re-inspection fee: $50.00.. Fees are calculated as: Not fully detailed in public sources; contact department..
03 How do I apply for a building permit in Gorham, ME?
To apply for a building permit in Gorham, ME, follow these steps: 1. Download applicable permit application from gorhammaine.gov or pick up at 75 South Street. 2. Complete application; include site plan and construction drawings as required. 3. Bring application to Code Enforcement Office for review. 4. Code Enforcement Officer may request additional information (engineer or surveyor certifications as needed). 5. Applicant or designee presents payment at Code Enforcement Office; permit released. 6. Post permit at job site. 7. Schedule required inspections (by appointment only). 8. Final inspection and project close-out.
04 What work is exempt from building permits in Gorham, ME?
Not all construction work requires a permit in Gorham, ME. The following work is generally exempt: Ordinary maintenance not involving structural change; Painting and similar finish work. Note: Refer to MUBEC Section 105.2 for complete list. When in doubt, confirm with the local building department before starting work.
05 How do I schedule a building inspection in Gorham, ME?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Gorham, ME via: 207-222-1605.
last verified April 2026 source Community Development -- Code Division ↗ entry id permits/maine/cumberland/gorham

Educational reference. Permit rules and fees change — confirm current requirements directly with Community Development -- Code Division before applying. Jaspector is not legal advice.