jaspector
City building permits

Town of Brunswick

How to apply for a building permit in Town of Brunswick, Maine. Permit authority, application steps, fees, and inspection requirements.

Last verified
April 2026
On this page 6
§ 01

Permit authority

Department of Planning and Development (Code Enforcement Division)

Street address
85 Union Street, Brunswick, ME 04011
Coverage
Town of Brunswick municipal limits. Note: Town of Brunswick, not City. Administers building, electrical, plumbing, and land use permits. Online Citizen Portal available 24/7.
Online portal
CivicGov Citizen Portal
CivicGov Citizen Portal
Additional resources
§ 02

When a permit is required

Permit triggers and exempt work for Brunswick

For all new construction, additions, alterations, demolition, electrical work, plumbing work, and new or replacement signs. Change of Use Permits required when use of a structure changes.

Ordinary maintenance and repair not involving structural change
Painting, decorating, and similar finish work
  • Exempt Ordinary maintenance and repair not involving structural change
  • Exempt Painting, decorating, and similar finish work

Note: Refer to MUBEC Section 105.2 for complete list; confirm with department.

Required documents
  • Site plan, construction drawings, energy compliance documentation (ResCheck for residential)
  • contractor license information.
Building code
MUBEC based on 2021 I-codes effective April 7, 2025 (permits applied for after that date). Prior permits subject to codes in effect at time of issuance.
Permit validity
Permit subject to 30-day appeal period from issuance. Expires if project has not commenced or is suspended/abandoned for 6 months.
Owner-builder
Not detailed; contact department.
Contractor requirements
Licensed electrician and plumber required for trade permits.
§ 03

Application process

Application → plan check → issuance → inspection → final

  1. 01
    Register for a Citizen Portal account at civicgov4.com/me_brunswick/portal/.
  2. 02
    Log in and select the appropriate permit type (building, electrical, plumbing, etc.).
  3. 03
    Upload required documents (site plan, construction drawings, energy compliance documentation).
  4. 04
    Submit application; fee payment required prior to review.
  5. 05
    Staff reviews application for completeness and code compliance.
  6. 06
    Permit issued; applicant notified via portal.
  7. 07
    Post permit card at job site.
  8. 08
    Schedule inspections through the portal or by calling 207-725-6660.
  9. 09
    Obtain Certificate of Occupancy after final inspection.

Source: Department of Planning and Development (Code Enforcement Division) ↗

§ 04

Fee schedule

Brunswick building permit fees

Fee type
Amount
01
Minimum permit fee
Not confirmed from public sources; contact department.
02
Plan check fee
Contact department.
03
Permit fee formula
Not fully detailed in public sources; contact department for current schedule.
04
Reinspection fee
Contact department.

Payment required prior to application review.

§ 05

Required inspections

Scheduling and sequence

How to schedule
Inspection hours
Business hours; contact for current schedule

Typical sequence: Foundation, framing, rough-in trades, insulation, final / Certificate of Occupancy

Contact department for reinspection process and fees.

Source: Department of Planning and Development (Code Enforcement Division) ↗

§ 06

Frequently asked

Common questions about Brunswick permits

01 Do I need a building permit in Brunswick, ME?
For all new construction, additions, alterations, demolition, electrical work, plumbing work, and new or replacement signs. Change of Use Permits required when use of a structure changes.
02 How much does a building permit cost in Brunswick, ME?
Building permit fees in Brunswick, ME are set by the local building department and vary by project type and valuation. The minimum permit fee is Not confirmed from public sources; contact department.. Fees are calculated as: Not fully detailed in public sources; contact department for current schedule.. Plan check fee: Contact department..
03 How do I apply for a building permit in Brunswick, ME?
To apply for a building permit in Brunswick, ME, follow these steps: 1. Register for a Citizen Portal account at civicgov4.com/me_brunswick/portal/. 2. Log in and select the appropriate permit type (building, electrical, plumbing, etc.). 3. Upload required documents (site plan, construction drawings, energy compliance documentation). 4. Submit application; fee payment required prior to review. 5. Staff reviews application for completeness and code compliance. 6. Permit issued; applicant notified via portal. 7. Post permit card at job site. 8. Schedule inspections through the portal or by calling 207-725-6660. 9. Obtain Certificate of Occupancy after final inspection.
04 What work is exempt from building permits in Brunswick, ME?
Not all construction work requires a permit in Brunswick, ME. The following work is generally exempt: Ordinary maintenance and repair not involving structural change; Painting, decorating, and similar finish work. Note: Refer to MUBEC Section 105.2 for complete list; confirm with department. When in doubt, confirm with the local building department before starting work.
05 How do I schedule a building inspection in Brunswick, ME?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Brunswick, ME via: Online portal, 207-725-6660.
last verified April 2026 source Department of Planning and Development (Code Enforcement Division) ↗ entry id permits/maine/cumberland/brunswick

Educational reference. Permit rules and fees change — confirm current requirements directly with Department of Planning and Development (Code Enforcement Division) before applying. Jaspector is not legal advice.