On this page 6
When a permit is required
Permit triggers and exempt work for Freeport
For any structural work or change of use. Plumbing, septic, sign, directional sign, banner, and temporary activity permits also issued by this office. Development impact fee applies for new construction over 1,000 sq ft and for new roads.
- Exempt Ordinary maintenance not involving structural change
- Exempt Painting and similar finish work
Note: Refer to MUBEC Section 105.2 for complete list; confirm with Codes Enforcement.
- Completed application, site plan, construction drawings
- plumbing and electrical permits require separate licensed contractor applications.
- Building code
- MUBEC; 2021 I-codes adopted effective June 24, 2025 per Town Council action. See https://www.freeportmaine.com/DocumentCenter/View/3330/Adopted-Codes-and-Standards-as-of-June-24-2025
- Owner-builder
- Not detailed; contact department.
- Contractor requirements
- State-licensed electrician and plumber required.
Application process
Typical processing: Residential building permits usually issued within one week. Commercial permits up to two weeks. Plumbing and electrical permits reviewed separately. All others reviewed within two weeks of submission.
- 01 Access online permitting system at freeportmaine.com/162/Codes-Enforcement or download PDF form.
- 02 Select permit type (building, plumbing, electrical, septic, sign, etc.).
- 03 Upload plans and required documents online.
- 04 Pay fees online through the portal.
- 05 Track application status in real time.
- 06 Communicate with Town staff through the portal.
- 07 Receive permit; post at job site.
- 08 Request inspections and view results through the portal.
- 09 Final inspection and close-out.
Typical processing time: Residential building permits usually issued within one week. Commercial permits up to two weeks. Plumbing and electrical permits reviewed separately. All others reviewed within two weeks of submission.
Source: Codes Enforcement Office ↗
Fee schedule
Freeport building permit fees
Online payment available through the permitting portal.
Required inspections
Scheduling and sequence
- Online portal (online)
- 207-865-4743 (phone)
- Inspection hours
- Business hours at 30 Main Street; contact for schedule.
Typical sequence: Foundation, framing, rough-in trades, insulation, final
Contact department.
Source: Codes Enforcement Office ↗
Frequently asked
Common questions about Freeport permits
01 Do I need a building permit in Freeport, ME? ▸
02 How much does a building permit cost in Freeport, ME? ▸
03 How do I apply for a building permit in Freeport, ME? ▸
04 How long does it take to get a building permit in Freeport, ME? ▸
05 What work is exempt from building permits in Freeport, ME? ▸
06 How do I schedule a building inspection in Freeport, ME? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Codes Enforcement Office before applying. Jaspector is not legal advice.