jaspector
City building permits

Town of Waltham

How to apply for a building permit in Town of Waltham, Vermont. Permit authority, application steps, fees, and inspection requirements.

Last verified
April 2026
On this page 6
§ 01

Permit authority

Zoning Administrator's Office / Development Review Board and Planning Commission

Street address
2053 Maple Street, Waltham, VT 05491
Coverage
All properties within the Town of Waltham.
§ 02

When a permit is required

Permit triggers and exempt work for Waltham

All land development per Waltham Zoning Regulations (September 2019). Includes construction, conditional uses, subdivisions, and farm structures.

Note: Listed in Waltham Zoning Regulations (September 2019). Contact ZA for definitive list. Typical Vermont exemptions apply.

Required documents
  • Applicable application form
  • Site plan
  • Fee
Building code
Waltham Zoning Regulations (September 2019); 2025 Vermont Fire and Building Safety Code (for commercial/rental); Vermont RBES/CBES energy codes. Vermont recording charges apply -- $15/page for document recording; $25/sheet for survey plot recording.
Permit validity
2 years per Vermont practice; confirm with ZA.
Owner-builder
No specific local owner-builder exemption. RBES Certificate required for new residential construction.
Contractor requirements
Vermont state licenses required for electricians, plumbers, and mechanical contractors.
§ 03

Application process

Typical processing: Up to 30 days per state law; DRB projects tied to monthly meeting schedule.

  1. 01
    Contact Jeff Kauffman Jr., ZA, at zoning@walthamvt.org or (802) 877-3641 during office hours (Tue/Thu 9:00 AM - 3:00 PM) to discuss the project.
  2. 02
    Download and complete the applicable form: Application for Zoning Permit for Construction, Conditional Use Permit Application, Permit for Subdivision of Land, or Permit to Build a Farm Structure.
  3. 03
    Include applicable fee per the Waltham Zoning and Subdivision Fees schedule (linked from zoning page; contact ZA for current amounts).
  4. 04
    Submit application to the Town Office (2053 Maple Street) during office hours.
  5. 05
    ZA acts within 30 days; DRB reviews matters requiring board action at monthly meetings (3rd Monday at 5:30 PM).
  6. 06
    Post permit for the 15-day appeal period before beginning work.
  7. 07
    Upon completion, apply for Certificate of Compliance.

Typical processing time: Up to 30 days per state law; DRB projects tied to monthly meeting schedule.

Source: Zoning Administrator's Office / Development Review Board and Planning Commission ↗

§ 04

Fee schedule

Waltham building permit fees

Fee type
Amount
01
Permit fee formula
"Waltham Zoning and Subdivision Fees" PDF linked from zoning page. Specific dollar amounts not published inline; contact ZA at zoning@walthamvt.org or (802) 877-3641 for current amounts.

At Town Office; confirm accepted payment methods.

Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.

§ 05

Required inspections

Scheduling and sequence

How to schedule
  • zoning@walthamvt.org (email)
  • (802) 877-3641 (phone)
Inspection hours
Tuesday and Thursday, 9:00 AM - 3:00 PM

Typical sequence: ZA reviews; permit posted for 15-day appeal period; final inspection upon completion before Certificate of Compliance issued.

§ 06

Frequently asked

Common questions about Waltham permits

01 Do I need a building permit in Waltham, VT?
All land development per Waltham Zoning Regulations (September 2019). Includes construction, conditional uses, subdivisions, and farm structures.
02 How much does a building permit cost in Waltham, VT?
Building permit fees in Waltham, VT are set by the local building department and vary by project type and valuation. Fees are calculated as: "Waltham Zoning and Subdivision Fees" PDF linked from zoning page. Specific dollar amounts not published inline; contact ZA at zoning@walthamvt.org or (802) 877-3641 for current amounts..
03 How do I apply for a building permit in Waltham, VT?
To apply for a building permit in Waltham, VT, follow these steps: 1. Contact Jeff Kauffman Jr., ZA, at zoning@walthamvt.org or (802) 877-3641 during office hours (Tue/Thu 9:00 AM - 3:00 PM) to discuss the project. 2. Download and complete the applicable form: Application for Zoning Permit for Construction, Conditional Use Permit Application, Permit for Subdivision of Land, or Permit to Build a Farm Structure. 3. Include applicable fee per the Waltham Zoning and Subdivision Fees schedule (linked from zoning page; contact ZA for current amounts). 4. Submit application to the Town Office (2053 Maple Street) during office hours. 5. ZA acts within 30 days; DRB reviews matters requiring board action at monthly meetings (3rd Monday at 5:30 PM). 6. Post permit for the 15-day appeal period before beginning work. 7. Upon completion, apply for Certificate of Compliance.
04 How long does it take to get a building permit in Waltham, VT?
Building permit processing times in Waltham, VT typically run Up to 30 days per state law; DRB projects tied to monthly meeting schedule.. Timelines can vary based on project complexity and current department workload.
05 How do I schedule a building inspection in Waltham, VT?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Waltham, VT via: zoning@walthamvt.org, (802) 877-3641.
last verified April 2026 source Zoning Administrator's Office / Development Review Board and Planning Commission ↗ entry id permits/vermont/addison/waltham

Educational reference. Permit rules and fees change — confirm current requirements directly with Zoning Administrator's Office / Development Review Board and Planning Commission before applying. Jaspector is not legal advice.