How to apply for a building permit in Town of Leicester, Vermont. Permit authority, application steps, fees, and inspection requirements.

Avg processing
Up to 30 days per state law.
Last verified
April 2026
On this page 6
§ 01

Permit authority

Zoning Administrator's Office

Street address
44 Schoolhouse Road, Leicester, VT 05733
Coverage
All properties within the Town of Leicester.
Additional resources
§ 02

When a permit is required

Permit triggers and exempt work for Leicester

All land development requires a permit per the Leicester Unified Zoning Bylaws (2017). A site visit by the ZA is required before the permit can be approved.

Note: Listed in Leicester Unified Zoning Bylaws (2017). Contact ZA to confirm. Typical Vermont exemptions: routine maintenance/repair with no footprint change, interior work not changing use, small accessory structures below the threshold.

Required documents
  • Zoning Permit Application
  • Scaled site plan
  • Floor plan
  • Elevations
  • List of abutting landowners
  • State permit verification
  • Fee
Building code
Leicester Unified Zoning Bylaws (2017); 2025 Vermont Fire and Building Safety Code (for commercial/rental); Vermont RBES/CBES energy codes.
Permit validity
2 years per Vermont practice; confirm with ZA.
Owner-builder
No specific local owner-builder exemption. RBES Certificate required for new residential construction.
Contractor requirements
Vermont state licenses required for electricians, plumbers, and mechanical contractors.
§ 03

Application process

Typical processing: Up to 30 days per state law.

  1. 01
    Contact Keith Arlund, ZA, at zoning@leicestervt.gov or (802) 465-8098 to discuss the project (by appointment).
  2. 02
    Download and complete the Zoning Permit Application. Required: scaled site plan, floor plan, elevations, list of abutting landowners, and confirmation that required Vermont state permits have been checked.
  3. 03
    A site visit by the ZA is required before permit approval; coordinate timing.
  4. 04
    Submit application with fee to the Town Office or as directed by ZA.
  5. 05
    The ZA acts within 30 days; permit deemed approved if no action by day 31.
  6. 06
    Post permit for the 15-day appeal period before beginning work.
  7. 07
    Upon project completion, apply for Certificate of Compliance or Occupancy.

Typical processing time: Up to 30 days per state law.

Source: Zoning Administrator's Office ↗

§ 04

Fee schedule

Leicester building permit fees

Fee type
Amount
01
Permit fee formula
No published fee schedule found online. Fees set by Select Board per regulations (Section 3.0.1). Permit application has blank fee field filled administratively.

Contact Keith Arlund, (802) 465-8098, zoning@leicestervt.gov, or Town Clerk (802) 247-5961, townclerk@leicestervt.gov for current amounts.

§ 05

Required inspections

Scheduling and sequence

How to schedule
  • zoning@leicestervt.gov (email)
  • (802) 465-8098 (phone)
Inspection hours
By appointment

Typical sequence: Site visit before permit approval; final inspection upon project completion before Certificate of Compliance or Occupancy issued.

§ 06

Frequently asked

Common questions about Leicester permits

01 Do I need a building permit in Leicester, VT?
All land development requires a permit per the Leicester Unified Zoning Bylaws (2017). A site visit by the ZA is required before the permit can be approved.
02 How much does a building permit cost in Leicester, VT?
Building permit fees in Leicester, VT are set by the local building department and vary by project type and valuation. Fees are calculated as: No published fee schedule found online. Fees set by Select Board per regulations (Section 3.0.1). Permit application has blank fee field filled administratively..
03 How do I apply for a building permit in Leicester, VT?
To apply for a building permit in Leicester, VT, follow these steps: 1. Contact Keith Arlund, ZA, at zoning@leicestervt.gov or (802) 465-8098 to discuss the project (by appointment). 2. Download and complete the Zoning Permit Application. Required: scaled site plan, floor plan, elevations, list of abutting landowners, and confirmation that required Vermont state permits have been checked. 3. A site visit by the ZA is required before permit approval; coordinate timing. 4. Submit application with fee to the Town Office or as directed by ZA. 5. The ZA acts within 30 days; permit deemed approved if no action by day 31. 6. Post permit for the 15-day appeal period before beginning work. 7. Upon project completion, apply for Certificate of Compliance or Occupancy.
04 How long does it take to get a building permit in Leicester, VT?
Building permit processing times in Leicester, VT typically run Up to 30 days per state law.. Timelines can vary based on project complexity and current department workload.
05 How do I schedule a building inspection in Leicester, VT?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Leicester, VT via: zoning@leicestervt.gov, (802) 465-8098.
last verified April 2026 source Zoning Administrator's Office ↗ entry id permits/vermont/addison/leicester

Educational reference. Permit rules and fees change — confirm current requirements directly with Zoning Administrator's Office before applying. Jaspector is not legal advice.