When a permit is required
Permit triggers and exempt work for Leicester
All land development requires a permit per the Leicester Unified Zoning Bylaws (2017). A site visit by the ZA is required before the permit can be approved.
Note: Listed in Leicester Unified Zoning Bylaws (2017). Contact ZA to confirm. Typical Vermont exemptions: routine maintenance/repair with no footprint change, interior work not changing use, small accessory structures below the threshold.
- Zoning Permit Application
- Scaled site plan
- Floor plan
- Elevations
- List of abutting landowners
- State permit verification
- Fee
- Building code
- Leicester Unified Zoning Bylaws (2017); 2025 Vermont Fire and Building Safety Code (for commercial/rental); Vermont RBES/CBES energy codes.
- Permit validity
- 2 years per Vermont practice; confirm with ZA.
- Owner-builder
- No specific local owner-builder exemption. RBES Certificate required for new residential construction.
- Contractor requirements
- Vermont state licenses required for electricians, plumbers, and mechanical contractors.
Application process
Typical processing: Up to 30 days per state law.
- 01 Contact Keith Arlund, ZA, at zoning@leicestervt.gov or (802) 465-8098 to discuss the project (by appointment).
- 02 Download and complete the Zoning Permit Application. Required: scaled site plan, floor plan, elevations, list of abutting landowners, and confirmation that required Vermont state permits have been checked.
- 03 A site visit by the ZA is required before permit approval; coordinate timing.
- 04 Submit application with fee to the Town Office or as directed by ZA.
- 05 The ZA acts within 30 days; permit deemed approved if no action by day 31.
- 06 Post permit for the 15-day appeal period before beginning work.
- 07 Upon project completion, apply for Certificate of Compliance or Occupancy.
Typical processing time: Up to 30 days per state law.
Source: Zoning Administrator's Office ↗
Fee schedule
Leicester building permit fees
Contact Keith Arlund, (802) 465-8098, zoning@leicestervt.gov, or Town Clerk (802) 247-5961, townclerk@leicestervt.gov for current amounts.
Required inspections
Scheduling and sequence
- zoning@leicestervt.gov (email)
- (802) 465-8098 (phone)
- Inspection hours
- By appointment
Typical sequence: Site visit before permit approval; final inspection upon project completion before Certificate of Compliance or Occupancy issued.
Frequently asked
Common questions about Leicester permits
01 Do I need a building permit in Leicester, VT? ▸
02 How much does a building permit cost in Leicester, VT? ▸
03 How do I apply for a building permit in Leicester, VT? ▸
04 How long does it take to get a building permit in Leicester, VT? ▸
05 How do I schedule a building inspection in Leicester, VT? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Zoning Administrator's Office before applying. Jaspector is not legal advice.