How to apply for a building permit in Town of Lincoln, New Hampshire. Permit authority, application steps, fees, and inspection requirements.

Last verified
April 2026
On this page 6
§ 01

Permit authority

Planning Department / Planning and Land Use, Town of Lincoln

Street address
148 Main Street, PO Box 25, Lincoln, NH 03251
Coverage
Lincoln uses a Land Use Permit (LUP) system. All buildings and structures must comply with NH State Building Code and Fire Code. A Land Use Compliance Certificate must be obtained before occupancy.
§ 02

When a permit is required

Permit triggers and exempt work for Lincoln

All buildings and structures (including retaining walls greater than 4 feet in height) must have a Land Use Permit. All must comply with NH State Building Code and Fire Code.

Note: Specific exemptions per Land Use Plan Ordinance; contact Planning Department.

Required documents
  • Land Use Permit Application (Short or Long Form)
  • Site plans
  • Building plans with elevations and drainage
Building code
NH State Building Code (RSA 155-A); NH State Fire Code.
Contractor requirements
NH state licensing required for electricians and plumbers.

Source: Planning Department / Planning and Land Use, Town of Lincoln ↗

§ 03

Application process

Application → plan check → issuance → inspection → final

  1. 01
    Determine whether the Short Form or Long Form application applies (contact Planning Dept. at (603) 745-8527 ext. 214 if unsure).
  2. 02
    Download the appropriate fillable PDF application.
  3. 03
    Prepare building plan and site plans showing elevations and drainage scales.
  4. 04
    Complete Land Use Permit Application, Sewer Tap Assessment Form, and Water Tap Assessment Form as applicable.
  5. 05
    Pay Water and Sewer Tap Fees and Bedroom Impact Fees (required before LUP is issued).
  6. 06
    Submit application to Town Hall.
  7. 07
    Applicant has one month to supply any outstanding items; after 1 month a $100 re-submission fee applies.
  8. 08
    LUP issued. Display laminated permit copy prominently on site for entire construction period.
  9. 09
    Upon completion, request Land Use Compliance Certificate inspection.
  10. 10
    Town inspects (compliance officer, fire chief, and public works director).
  11. 11
    Land Use Compliance Certificate issued. Occupancy is prohibited until certificate is issued.

Source: Planning Department / Planning and Land Use, Town of Lincoln ↗

§ 04

Fee schedule

Lincoln building permit fees

Fee type
Amount
01
Permit fee formula
Includes Water and Sewer Tap Fees, Bedroom Impact Fees, and permit fees. Re-submission fee: $100 after one month without completing application.

Fees must be paid before LUP is issued. Contact Planning Department at (603) 745-8527 ext. 214 for current fee schedule.

§ 05

Required inspections

Scheduling and sequence

How to schedule
  • (603) 745-8527 ext. 214 (phone)
Inspection hours
Monday through Wednesday and Friday, 8:00 AM to 3:00 PM.

Typical sequence: Land Use Compliance Certificate inspection upon project completion (compliance officer, fire chief, public works director present). All structures must be 100% complete with water meters and radio read boxes installed.

§ 06

Frequently asked

Common questions about Lincoln permits

01 Do I need a building permit in Lincoln, NH?
All buildings and structures (including retaining walls greater than 4 feet in height) must have a Land Use Permit. All must comply with NH State Building Code and Fire Code.
02 How much does a building permit cost in Lincoln, NH?
Building permit fees in Lincoln, NH are set by the local building department and vary by project type and valuation. Fees are calculated as: Includes Water and Sewer Tap Fees, Bedroom Impact Fees, and permit fees. Re-submission fee: $100 after one month without completing application..
03 How do I apply for a building permit in Lincoln, NH?
To apply for a building permit in Lincoln, NH, follow these steps: 1. Determine whether the Short Form or Long Form application applies (contact Planning Dept. at (603) 745-8527 ext. 214 if unsure). 2. Download the appropriate fillable PDF application. 3. Prepare building plan and site plans showing elevations and drainage scales. 4. Complete Land Use Permit Application, Sewer Tap Assessment Form, and Water Tap Assessment Form as applicable. 5. Pay Water and Sewer Tap Fees and Bedroom Impact Fees (required before LUP is issued). 6. Submit application to Town Hall. 7. Applicant has one month to supply any outstanding items; after 1 month a $100 re-submission fee applies. 8. LUP issued. Display laminated permit copy prominently on site for entire construction period. 9. Upon completion, request Land Use Compliance Certificate inspection. 10. Town inspects (compliance officer, fire chief, and public works director). 11. Land Use Compliance Certificate issued. Occupancy is prohibited until certificate is issued.
04 How do I schedule a building inspection in Lincoln, NH?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Lincoln, NH via: (603) 745-8527 ext. 214.
last verified April 2026 source Planning Department / Planning and Land Use, Town of Lincoln ↗ entry id permits/new-hampshire/grafton/lincoln

Educational reference. Permit rules and fees change — confirm current requirements directly with Planning Department / Planning and Land Use, Town of Lincoln before applying. Jaspector is not legal advice.