How to apply for a building permit in Town of Hebron, New Hampshire. Permit authority, application steps, fees, and inspection requirements.

Last verified
April 2026
On this page 6
§ 01

Permit authority

Office of Selectmen / Select Board, Town of Hebron

Coverage
Permits administered by the Select Board. Residential Building Application handled by the Selectmen office. 21-day advance notice required before commencement of work. Electricians and plumbers must present licenses to the Selectmen office before permit is issued.
Online portal
Hebron Town Website
§ 02

When a permit is required

Permit triggers and exempt work for Hebron

Any owner or lessee who plans to construct, structurally enlarge, move, or locate a building or structure must obtain a building permit.

Work that does not involve construction, structural enlargement, moving, or locating a building or structure
  • Exempt Work that does not involve construction, structural enlargement, moving, or locating a building or structure

Note: Contact Selectmen office for specific exemptions.

Required documents
  • Completed Residential Building Application
  • Scale drawing showing setbacks and building locations
  • Brief description of the proposal
Building code
NH State Building Code (RSA 155-A); Town of Hebron Zoning Ordinance.
Contractor requirements
Electricians and plumbers must present state licenses and photo ID to Selectmen office before permit is issued.
§ 03

Application process

Typical processing: Allow at least 21 days from application to commencement.

  1. 01
    Download Residential Building Application from hebronnh.gov (fillable PDF).
  2. 02
    File application with the Board of Selectmen at least 21 days prior to commencement of construction.
  3. 03
    Include a scale drawing showing all setbacks and locations of buildings, and a brief description of the proposal.
  4. 04
    Include applicable fee (per Select Board fee schedule).
  5. 05
    Electricians and plumbers named on the application must present their licenses and a photo ID to the Selectmen office before the permit is issued.
  6. 06
    Selectmen review and issue permit.
  7. 07
    Post permit in an obvious location on the premises, visible from the street.
  8. 08
    Schedule inspections per NH State Building Code.

Typical processing time: Allow at least 21 days from application to commencement.

Source: Office of Selectmen / Select Board, Town of Hebron ↗

§ 04

Fee schedule

Hebron building permit fees

Fee type
Amount
01
Permit fee formula
Per Selectmen-established fee schedule.

Submit with application to Selectmen office.

§ 05

Required inspections

Scheduling and sequence

How to schedule
Inspection hours
Contact town office for current hours.

Typical sequence: Per NH State Building Code: foundation, framing, insulation, final.

§ 06

Frequently asked

Common questions about Hebron permits

01 Do I need a building permit in Hebron, NH?
Any owner or lessee who plans to construct, structurally enlarge, move, or locate a building or structure must obtain a building permit.
02 How much does a building permit cost in Hebron, NH?
Building permit fees in Hebron, NH are set by the local building department and vary by project type and valuation. Fees are calculated as: Per Selectmen-established fee schedule..
03 How do I apply for a building permit in Hebron, NH?
To apply for a building permit in Hebron, NH, follow these steps: 1. Download Residential Building Application from hebronnh.gov (fillable PDF). 2. File application with the Board of Selectmen at least 21 days prior to commencement of construction. 3. Include a scale drawing showing all setbacks and locations of buildings, and a brief description of the proposal. 4. Include applicable fee (per Select Board fee schedule). 5. Electricians and plumbers named on the application must present their licenses and a photo ID to the Selectmen office before the permit is issued. 6. Selectmen review and issue permit. 7. Post permit in an obvious location on the premises, visible from the street. 8. Schedule inspections per NH State Building Code.
04 How long does it take to get a building permit in Hebron, NH?
Building permit processing times in Hebron, NH typically run Allow at least 21 days from application to commencement.. Timelines can vary based on project complexity and current department workload.
05 What work is exempt from building permits in Hebron, NH?
Not all construction work requires a permit in Hebron, NH. The following work is generally exempt: Work that does not involve construction, structural enlargement, moving, or locating a building or structure. Note: Contact Selectmen office for specific exemptions. When in doubt, confirm with the local building department before starting work.
06 How do I schedule a building inspection in Hebron, NH?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Hebron, NH via: Contact Selectmen office via hebronnh.gov.
last verified April 2026 source Office of Selectmen / Select Board, Town of Hebron ↗ entry id permits/new-hampshire/grafton/hebron

Educational reference. Permit rules and fees change — confirm current requirements directly with Office of Selectmen / Select Board, Town of Hebron before applying. Jaspector is not legal advice.