When a permit is required
Permit triggers and exempt work for Montgomery
New construction, additions, alterations, demolition, change of use, signs, subdivisions, and variance/conditional use.
- Exempt Normal maintenance and repair not changing use or structure
- Exempt Agricultural structures on working farms
Note: Standard Vermont exemptions per 24 V.S.A. Sections 4412 and 4413; verify current Montgomery regulations for local additions.
- Completed application
- Site plan
- Building plans
- Estimated cost
- Building code
- Montgomery Zoning Regulations (adopted November 5, 2018). State 2025 Vermont Fire and Building Safety Code for regulated structures. RBES/CBES apply.
- Permit validity
- Contact the Zoning Administrator. Standard Vermont practice: 12 months.
- Owner-builder
- No state general contractor license required; licensed trades required.
- Contractor requirements
- General contractor -- no Vermont state license required. Electricians and plumbers must be DFS-licensed.
Source: Zoning Administrator ↗
Application process
Typical processing: Not publicly specified; up to 30 days per Vermont statute.
- 01 Contact the Zoning Administrator at 802-326-4719 to determine permit requirements and obtain application forms.
- 02 Download forms, zoning regulations, and fee schedule from https://montgomeryvt.us/g/office/zoning.
- 03 Complete the application with required information, site plan, and building plans.
- 04 Submit completed application with fees to the Town Office.
- 05 Zoning Administrator reviews for compliance with the Montgomery Zoning Regulations (adopted November 5, 2018).
- 06 If DRB review is required, applicant is scheduled for a hearing.
- 07 Permit issued upon approval.
- 08 For state-regulated structures, apply to DFS separately.
- 09 Schedule inspections and obtain Certificate of Compliance.
Typical processing time: Not publicly specified; up to 30 days per Vermont statute.
Source: Zoning Administrator ↗
Required inspections
Scheduling and sequence
- 802-326-4719 (phone)
- Inspection hours
- Monday: 9:00 AM to 6:00 PM; Tuesday through Thursday: 9:00 AM to 3:00 PM; Friday: 9:00 AM to 1:00 PM
Typical sequence: Confirm with Zoning Administrator. DFS coordinates for state-permitted projects.
Source: Zoning Administrator ↗
Frequently asked
Common questions about Montgomery permits
01 Do I need a building permit in Montgomery, VT? ▸
02 How do I apply for a building permit in Montgomery, VT? ▸
03 How long does it take to get a building permit in Montgomery, VT? ▸
04 What work is exempt from building permits in Montgomery, VT? ▸
05 How do I schedule a building inspection in Montgomery, VT? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Zoning Administrator before applying. Jaspector is not legal advice.