How to apply for a building permit in Town of Fletcher, Vermont. Permit authority, application steps, fees, and inspection requirements.

Last verified
April 2026
On this page 5
§ 01

Permit authority

Zoning Administrator

Street address
33 Shaw Road, Cambridge, VT 05444
Coverage
Fletcher is a small rural town in southeastern Franklin County. The town has adopted zoning regulations. State DFS issues permits for regulated structures. Note: Fletcher's town office mailing address (Cambridge, VT) is technically in Lamoille County; the town spans the county boundary.
§ 02

When a permit is required

Permit triggers and exempt work for Fletcher

New construction, additions, alterations, demolition, change of use, and signs.

Normal maintenance and repair not changing use or structure
Agricultural structures on working farms
  • Exempt Normal maintenance and repair not changing use or structure
  • Exempt Agricultural structures on working farms

Note: Standard Vermont exemptions per 24 V.S.A. Sections 4412 and 4413; verify Fletcher's current zoning regulations for local additions.

Required documents
  • Completed application
  • Site plan
  • Building plans
  • Estimated cost
Building code
Town of Fletcher zoning regulations (2019 edition). State 2025 Vermont Fire and Building Safety Code for regulated structures. RBES/CBES apply.
Permit validity
Contact the Zoning Administrator. Standard Vermont practice: 12 months.
Owner-builder
No state general contractor license required; licensed trades required.
Contractor requirements
General contractor -- no Vermont state license required. Electricians and plumbers must be DFS-licensed.

Source: Zoning Administrator ↗

§ 03

Application process

Typical processing: Not publicly specified; up to 30 days per Vermont statute.

  1. 01
    Contact the Zoning Administrator (Cory Getty) at za@fletchervt.net or the Town Clerk at 802-849-6616 to determine permit requirements.
  2. 02
    Obtain the zoning permit application from the Town Office or the Zoning page at https://fletchervt.net/zoning/.
  3. 03
    Complete the application with required site plan, building plans, and project description.
  4. 04
    Submit completed application with fees at the Town Office or by appointment.
  5. 05
    Zoning Administrator reviews for compliance with Fletcher's adopted zoning regulations.
  6. 06
    If DRB review is required, applicant is scheduled for a hearing.
  7. 07
    Permit issued upon approval.
  8. 08
    For state-regulated structures, apply to DFS separately.
  9. 09
    Schedule inspections and obtain Certificate of Compliance.

Typical processing time: Not publicly specified; up to 30 days per Vermont statute.

Source: Zoning Administrator ↗

§ 04

Required inspections

Scheduling and sequence

How to schedule
  • za@fletchervt.net (email)
  • 802-849-6616 (phone)
Inspection hours
Mondays 6:00 PM to 8:00 PM or by appointment with the Zoning Administrator; general office hours Monday through Thursday, 8:00 AM to 3:30 PM

Typical sequence: Confirm with Zoning Administrator. DFS coordinates for state-permitted projects.

Source: Zoning Administrator ↗

§ 05

Frequently asked

Common questions about Fletcher permits

01 Do I need a building permit in Fletcher, VT?
New construction, additions, alterations, demolition, change of use, and signs.
02 How do I apply for a building permit in Fletcher, VT?
To apply for a building permit in Fletcher, VT, follow these steps: 1. Contact the Zoning Administrator (Cory Getty) at za@fletchervt.net or the Town Clerk at 802-849-6616 to determine permit requirements. 2. Obtain the zoning permit application from the Town Office or the Zoning page at https://fletchervt.net/zoning/. 3. Complete the application with required site plan, building plans, and project description. 4. Submit completed application with fees at the Town Office or by appointment. 5. Zoning Administrator reviews for compliance with Fletcher's adopted zoning regulations. 6. If DRB review is required, applicant is scheduled for a hearing. 7. Permit issued upon approval. 8. For state-regulated structures, apply to DFS separately. 9. Schedule inspections and obtain Certificate of Compliance.
03 How long does it take to get a building permit in Fletcher, VT?
Building permit processing times in Fletcher, VT typically run Not publicly specified; up to 30 days per Vermont statute.. Timelines can vary based on project complexity and current department workload.
04 What work is exempt from building permits in Fletcher, VT?
Not all construction work requires a permit in Fletcher, VT. The following work is generally exempt: Normal maintenance and repair not changing use or structure; Agricultural structures on working farms. Note: Standard Vermont exemptions per 24 V.S.A. Sections 4412 and 4413; verify Fletcher's current zoning regulations for local additions. When in doubt, confirm with the local building department before starting work.
05 How do I schedule a building inspection in Fletcher, VT?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Fletcher, VT via: za@fletchervt.net, 802-849-6616.
last verified April 2026 source Zoning Administrator ↗ entry id permits/vermont/franklin/fletcher

Educational reference. Permit rules and fees change — confirm current requirements directly with Zoning Administrator before applying. Jaspector is not legal advice.