jaspector
City building permits

Town of Limestone

How to apply for a building permit in Town of Limestone, Maine. Permit authority, application steps, fees, and inspection requirements.

Avg processing
Not formally published; contact office.
Last verified
April 2026
On this page 5
§ 01

Permit authority

Code Enforcement Department

Street address
93 Main Street, Limestone, ME 04750
Coverage
Town of Limestone, Aroostook County. Population below 4,000; MUBEC not mandatory. Local Land Use and Zoning Ordinance governs.
Online portal
Code Enforcement Permits
PDF Forms
Additional resources
§ 02

When a permit is required

Permit triggers and exempt work for Limestone

Construction, demolition, alterations, moving structures, and changes of use.

Re-roofing
Re-siding
New interior finish coverings (flooring, sheetrock, paneling, countertops)
Replacing windows/doors with identical size in the same existing locations
  • Exempt Re-roofing
  • Exempt Re-siding
  • Exempt New interior finish coverings (flooring, sheetrock, paneling, countertops)
  • Exempt Replacing windows/doors with identical size in the same existing locations

Note: Contact Code Enforcement at (207) 325-4704 ext. 104 to confirm any additional exemptions.

Required documents
  • Completed permit application
  • Additional requirements per office
Building code
Local Land Use and Zoning Ordinance; 2009 IPMC (International Property Maintenance Code) adopted per town website. Confirm current building code with office.
Permit validity
Contact office
Owner-builder
Owner-builders may perform work on their own residence; Maine trade licensing rules apply.
Contractor requirements
Maine-licensed electricians and plumbers required. No state GC license.

Source: Code Enforcement Department ↗

§ 03

Application process

Typical processing: Not formally published; contact office.

  1. 01
    Contact Code Enforcement at (207) 325-4704 ext. 104 or code@limestonemaine.org to confirm permit requirements for the project.
  2. 02
    Download the Building/Use Permit application from https://limestonemaine.org/code-enforcement/permit/.
  3. 03
    Complete the application specifying the project type.
  4. 04
    Submit the application to the CEO at 93 Main Street.
  5. 05
    CEO reviews and may: grant the permit, grant with conditions, deny with written reasoning, or forward to appropriate board or state department.
  6. 06
    Fees must be paid before the permit is granted; no work may begin until the permit is issued.
  7. 07
    Contact office to schedule required inspections.
  8. 08
    Certificate of Occupancy as applicable.

Typical processing time: Not formally published; contact office.

Source: Code Enforcement Department ↗

§ 04

Required inspections

Scheduling and sequence

How to schedule
  • (207) 325-4704 ext. 104 (phone)
  • code@limestonemaine.org (email)
Inspection hours
Contact office for current schedule

Typical sequence: Contact office for current requirements.

Source: Code Enforcement Department ↗

§ 05

Frequently asked

Common questions about Limestone permits

01 Do I need a building permit in Limestone, ME?
Construction, demolition, alterations, moving structures, and changes of use.
02 How do I apply for a building permit in Limestone, ME?
To apply for a building permit in Limestone, ME, follow these steps: 1. Contact Code Enforcement at (207) 325-4704 ext. 104 or code@limestonemaine.org to confirm permit requirements for the project. 2. Download the Building/Use Permit application from https://limestonemaine.org/code-enforcement/permit/. 3. Complete the application specifying the project type. 4. Submit the application to the CEO at 93 Main Street. 5. CEO reviews and may: grant the permit, grant with conditions, deny with written reasoning, or forward to appropriate board or state department. 6. Fees must be paid before the permit is granted; no work may begin until the permit is issued. 7. Contact office to schedule required inspections. 8. Certificate of Occupancy as applicable.
03 How long does it take to get a building permit in Limestone, ME?
Building permit processing times in Limestone, ME typically run Not formally published; contact office.. Timelines can vary based on project complexity and current department workload.
04 What work is exempt from building permits in Limestone, ME?
Not all construction work requires a permit in Limestone, ME. The following work is generally exempt: Re-roofing; Re-siding; New interior finish coverings (flooring, sheetrock, paneling, countertops); Replacing windows/doors with identical size in the same existing locations. Note: Contact Code Enforcement at (207) 325-4704 ext. 104 to confirm any additional exemptions. When in doubt, confirm with the local building department before starting work.
05 How do I schedule a building inspection in Limestone, ME?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Limestone, ME via: (207) 325-4704 ext. 104, code@limestonemaine.org.
last verified April 2026 source Code Enforcement Department ↗ entry id permits/maine/aroostook/limestone

Educational reference. Permit rules and fees change — confirm current requirements directly with Code Enforcement Department before applying. Jaspector is not legal advice.