On this page 6
When a permit is required
Permit triggers and exempt work for South Jordan
South Jordan provides residential and commercial permit information and requires permit applications plus supporting plans and documents for covered work.
Note: No stand-alone exemption list was clearly posted; South Jordan posts detailed permit-type requirements, so confirm any claimed exemption directly with the Building Department.
- Permit application
- Project-specific plan review checklist
- Owner-builder certification when applicable
- Outside-agency approvals for certain demolition/noise cases
- Various building trade checklists
- Building code
- City lists 2021 IRC, 2021 ISPSC, 2021 IBC, 2021 IPC, 2021 IMC, 2021 IFGC, 2021 IEBC, 2023 NEC, and applicable Utah amendments, plus local design criteria.
- Permit validity
- Not clearly posted.
- Owner-builder
- Owner/Builder Certification PDF is posted on the Building Department page.
- Contractor requirements
- Utah contractor licensing applies; outside-agency approvals and specialized trade requirements are referenced.
Application process
Typical processing: No fixed review time clearly posted.
- 01 Review the Building Department page and project-specific checklists/forms.
- 02 Prepare permit application and all required plans/documents for the project type.
- 03 Apply through the CityView online portal.
- 04 Submit supporting checklists and outside-agency approvals as required.
- 05 Pay city fees and impact fees as applicable.
- 06 Schedule inspections through the CityView portal.
Typical processing time: No fixed review time clearly posted.
Fee schedule
South Jordan building permit fees
Online payment terms linked from city page; portal payment workflow applies.
Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.
Required inspections
Scheduling and sequence
- CityView Portal inspection locator (online)
- Inspection hours
- Not clearly stated.
Typical sequence: Permit-specific trade and final inspections scheduled through portal after permit issuance.
Frequently asked
Common questions about South Jordan permits
01 Do I need a building permit in South Jordan, UT? ▸
02 How much does a building permit cost in South Jordan, UT? ▸
03 How do I apply for a building permit in South Jordan, UT? ▸
04 How long does it take to get a building permit in South Jordan, UT? ▸
05 How do I schedule a building inspection in South Jordan, UT? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Building Department, South Jordan City before applying. Jaspector is not legal advice.