jaspector
City building permits

Draper

How to apply for a building permit in Draper, Utah. Permit authority, application steps, fees, and inspection requirements.

Last verified
April 2026
On this page 6
§ 01

Permit authority

Building Division, Draper City

Street address
Building Office, Draper City, 1020 E Pioneer Rd, Draper, UT 84020
Coverage
Applies inside Draper City only.
§ 02

When a permit is required

Permit triggers and exempt work for Draper

The Building Division conducts permit review and inspections for new construction and remodeling requiring compliance with local and state-mandated regulations.

Note: No clean city-specific exempt-work list was surfaced on the main Draper permit pages; confirm directly with the Building Division.

Required documents
  • Permit application
  • Plans
  • Outside-agency approvals
  • Project-specific checklists
  • For demolition: utility disconnect letters, environmental clearances, and photo documentation
Building code
Draper administers Utah-adopted building codes with local city code and design requirements.
Permit validity
Not clearly posted.
Owner-builder
Confirm directly with Draper before application; Utah owner-builder rules apply.
Contractor requirements
Utah licensing rules apply; city page expects contractor and project-team documentation through the portal.
§ 03

Application process

Typical processing: Not clearly posted as a fixed citywide review time.

  1. 01
    Review building permit requirements and project-specific submittal documents on the Building Permits page.
  2. 02
    Create an account in Draper's Online Services Portal.
  3. 03
    Submit the permit application and upload plans/documents through the portal.
  4. 04
    Include required outside-agency and city approvals at time of application where applicable.
  5. 05
    Pay fees and deposits, including application fees for certain permit types such as demolition.
  6. 06
    After issuance, schedule inspections through the portal by selecting the inspection card and ready inspection action.

Typical processing time: Not clearly posted as a fixed citywide review time.

Source: Building Division, Draper City ↗

§ 04

Fee schedule

Draper building permit fees

Fee type
Amount
01
Plan check fee
Applies through permit review; demolition submittal requirements note a $150 application fee invoiced 24-48 hours after submission.
02
Permit fee formula
City consolidated fee schedule covers building review and permit categories.

Portal-based invoicing and payment workflow; applicants receive invoice notices by email.

Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.

§ 05

Required inspections

Scheduling and sequence

How to schedule
Inspection hours
Monday-Friday 8:00 a.m. to 5:00 p.m.; same-day inspections not available.

Typical sequence: Log in, open Inspections, view ready inspections, and request specific inspection/reinspection; results visible in portal after completion.

Source: Building Division, Draper City ↗

§ 06

Frequently asked

Common questions about Draper permits

01 Do I need a building permit in Draper, UT?
The Building Division conducts permit review and inspections for new construction and remodeling requiring compliance with local and state-mandated regulations.
02 How much does a building permit cost in Draper, UT?
Building permit fees in Draper, UT are set by the local building department and vary by project type and valuation. Fees are calculated as: City consolidated fee schedule covers building review and permit categories.. Plan check fee: Applies through permit review; demolition submittal requirements note a $150 application fee invoiced 24-48 hours after submission..
03 How do I apply for a building permit in Draper, UT?
To apply for a building permit in Draper, UT, follow these steps: 1. Review building permit requirements and project-specific submittal documents on the Building Permits page. 2. Create an account in Draper's Online Services Portal. 3. Submit the permit application and upload plans/documents through the portal. 4. Include required outside-agency and city approvals at time of application where applicable. 5. Pay fees and deposits, including application fees for certain permit types such as demolition. 6. After issuance, schedule inspections through the portal by selecting the inspection card and ready inspection action.
04 How long does it take to get a building permit in Draper, UT?
Building permit processing times in Draper, UT typically run Not clearly posted as a fixed citywide review time.. Timelines can vary based on project complexity and current department workload.
05 How do I schedule a building inspection in Draper, UT?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Draper, UT via: Online Services Portal, 801-576-6581 for portal issues.
last verified April 2026 source Building Division, Draper City ↗ entry id permits/utah/salt-lake/draper

Educational reference. Permit rules and fees change — confirm current requirements directly with Building Division, Draper City before applying. Jaspector is not legal advice.