On this page 6
When a permit is required
Permit triggers and exempt work for Midvale
A building permit is required for most construction in the city.
- Exempt Detached accessory building less than 120 square feet for nonresidential use
- Exempt Detached accessory building less than 200 square feet for residential use
Note: City notes there are exceptions, but most construction still requires a permit.
- Online application
- Plans
- Structural and project documents
- Owner-builder form and pre-plan check fee materials where applicable
- Building code
- Midvale links directly to Utah statewide amendments and administers Utah-adopted state construction code.
- Permit validity
- Not clearly posted.
- Owner-builder
- Owner Builder Form is posted on the city page.
- Contractor requirements
- Utah licensing applies; city guidance references trade permits and professional requirements.
Application process
Typical processing: Not clearly posted as a fixed SLA.
- 01 Review Midvale Building and Safety guidance and determine whether the project requires a permit.
- 02 Submit the online building permit application form.
- 03 If uploaded documents exceed 4 MB, email them to Building and Safety.
- 04 Provide supporting plans, calculations, and forms as required; pre-construction meetings required on certain project types.
- 05 Pay permit and plan review fees.
- 06 Request inspections online at least 24 hours in advance.
Typical processing time: Not clearly posted as a fixed SLA.
Source: Building and Safety, Midvale City Community Development ↗
Fee schedule
Midvale building permit fees
Confirm with Midvale permit staff during application and issuance.
Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.
Required inspections
Scheduling and sequence
- Building inspection request form (online)
- Scheduling deadline
- At least 24 hours in advance; requests Monday-Thursday between 8:00 a.m. and 3:00 p.m.
- Inspection hours
- Generally between 8:00 a.m. and 3:00 p.m.
Typical sequence: Footing/foundation and other timed inspections can request a time; standard project inspections proceed by permit scope until final.
Frequently asked
Common questions about Midvale permits
01 Do I need a building permit in Midvale, UT? ▸
02 How much does a building permit cost in Midvale, UT? ▸
03 How do I apply for a building permit in Midvale, UT? ▸
04 How long does it take to get a building permit in Midvale, UT? ▸
05 What work is exempt from building permits in Midvale, UT? ▸
06 How do I schedule a building inspection in Midvale, UT? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Building and Safety, Midvale City Community Development before applying. Jaspector is not legal advice.