When a permit is required
Permit triggers and exempt work for Riverton
Any owner or authorized agent intending to construct, enlarge, alter, repair, move, demolish, change occupancy, or perform regulated electrical, gas, mechanical, or plumbing work must obtain the required permit.
- Exempt One-story detached accessory structures for tool/storage sheds, playhouses, similar uses under 200 square feet and 16 feet height
- Exempt Retaining walls not over 4 feet high from bottom of footing to top, unless supporting a surcharge
- Exempt Fences up to 6 feet high
- Fillable building permit application
- Plans
- Engineering documents
- Specifications
- Owner-builder certificate if applicable
- Land disturbance permit where required
- Permit-type-specific supporting letters for demolition
- Building code
- Riverton provides a Building Codes and Design Criteria page and administers Utah state law and city ordinance requirements.
- Permit validity
- Not clearly posted.
- Owner-builder
- Riverton posts an Owner / Builder Certification form; owner-builder declarations are illegal on commercial projects.
- Contractor requirements
- Utah licensing applies; city forms request contractor information.
Application process
Typical processing: No fixed review time clearly posted.
- 01 Review Riverton's Building Applications, Permits and Inspections Required page.
- 02 Download and complete the fillable PDF building permit application and any owner-builder or land disturbance forms that apply.
- 03 Submit permit applications, plans, engineering documents, and specifications digitally to building@rivertonutah.gov.
- 04 For projects requiring land disturbance approval or sign review, complete parallel submissions with appropriate city division.
- 05 Pay permit fees and obtain permit issuance.
- 06 Call before 1:00 p.m. for inspection requests and complete required inspections from footing through final.
Typical processing time: No fixed review time clearly posted.
Source: Building Inspections and Permits, Riverton City Development Services ↗
Fee schedule
Riverton building permit fees
Confirm directly with permit staff during issuance.
Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.
Required inspections
Scheduling and sequence
- Call Building Department before 1:00 p.m. (phone)
- Scheduling deadline
- Before 1:00 p.m. to request inspections.
- Inspection hours
- Monday-Friday 8:00 a.m. to 5:00 p.m.
Typical sequence: Riverton posts required inspections document; sequence varies by project, referencing inspections required through construction and final approval.
Frequently asked
Common questions about Riverton permits
01 Do I need a building permit in Riverton, UT? ▸
02 How much does a building permit cost in Riverton, UT? ▸
03 How do I apply for a building permit in Riverton, UT? ▸
04 How long does it take to get a building permit in Riverton, UT? ▸
05 What work is exempt from building permits in Riverton, UT? ▸
06 How do I schedule a building inspection in Riverton, UT? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Building Inspections and Permits, Riverton City Development Services before applying. Jaspector is not legal advice.