jaspector
City building permits

Herriman

How to apply for a building permit in Herriman, Utah. Permit authority, application steps, fees, and inspection requirements.

Avg processing
No fixed review time clearly posted.
Last verified
April 2026
On this page 6
§ 01

Permit authority

Building Department, Herriman City

Street address
5355 W Herriman Main St, Herriman, UT 84096
Coverage
Applies inside Herriman City only.
§ 02

When a permit is required

Permit triggers and exempt work for Herriman

Most construction work requires a permit and inspections by the Building Department.

Fences up to 7 feet high, subject to clear-view and taller-fence rules
Swings and playground equipment for residence
Decks with walking surface up to 30 inches above finished ground, unless serving required exit or triggering code/zoning review
One-story detached garages, sheds, playhouses, pergolas, similar buildings 200 square feet or less, unless utilities added
Prefabricated above-ground swimming pools not exceeding 2 feet depth
Portable spa with cord and plug, not hard-wired
Window awnings projecting no more than 54 inches
Repair/maintenance of electrical and mechanical systems, except furnace, AC, water heater
Adding a layer of shingles, subject to city reroof limits
  • Exempt Fences up to 7 feet high, subject to clear-view and taller-fence rules
  • Exempt Swings and playground equipment for residence
  • Exempt Decks with walking surface up to 30 inches above finished ground, unless serving required exit or triggering code/zoning review
  • Exempt One-story detached garages, sheds, playhouses, pergolas, similar buildings 200 square feet or less, unless utilities added
  • Exempt Prefabricated above-ground swimming pools not exceeding 2 feet depth
  • Exempt Portable spa with cord and plug, not hard-wired
  • Exempt Window awnings projecting no more than 54 inches
  • Exempt Repair/maintenance of electrical and mechanical systems, except furnace, AC, water heater
  • Exempt Adding a layer of shingles, subject to city reroof limits
Required documents
  • Permit application materials for selected project type
  • Owner-builder declaration when applicable
  • Project-specific forms and submittal pages
Building code
Herriman provides a Building Codes and Design Criteria page and administers Utah-adopted codes with city requirements.
Permit validity
Not clearly posted.
Owner-builder
Herriman has a dedicated Owner/Builder Declaration page.
Contractor requirements
Utah licensing applies; city materials emphasize licensed teams and code compliance.
§ 03

Application process

Typical processing: No fixed review time clearly posted.

  1. 01
    Review Herriman's Building and Building Permits pages.
  2. 02
    Select the applicable permit application and project page from city building resources.
  3. 03
    Submit permit application materials and supporting documents to the city.
  4. 04
    Coordinate any owner-builder declaration or permit transfer requirements if applicable.
  5. 05
    Pay fees per master fee schedule and building payment rules.
  6. 06
    Schedule inspections by phone before 4:00 p.m.

Typical processing time: No fixed review time clearly posted.

Source: Building Department, Herriman City ↗

§ 04

Fee schedule

Herriman building permit fees

Fee type
Amount
01
Plan check fee
Confirm in current fee schedule.
02
Permit fee formula
See master fee schedule PDF.

Payments over $1,000 may be made by phone with electronic check; $1,000 and less can be made with Visa, Mastercard, Discover, or American Express.

Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.

§ 05

Required inspections

Scheduling and sequence

How to schedule
  • 801-446-5327 before 4:00 p.m. (phone)
Scheduling deadline
Before 4:00 p.m.
Inspection hours
7:30 a.m. to 5:30 p.m. Monday-Friday

Typical sequence: Permit-specific inspections coordinated by Building Department until final approval.

§ 06

Frequently asked

Common questions about Herriman permits

01 Do I need a building permit in Herriman, UT?
Most construction work requires a permit and inspections by the Building Department.
02 How much does a building permit cost in Herriman, UT?
Building permit fees in Herriman, UT are set by the local building department and vary by project type and valuation. Fees are calculated as: See master fee schedule PDF.. Plan check fee: Confirm in current fee schedule..
03 How do I apply for a building permit in Herriman, UT?
To apply for a building permit in Herriman, UT, follow these steps: 1. Review Herriman's Building and Building Permits pages. 2. Select the applicable permit application and project page from city building resources. 3. Submit permit application materials and supporting documents to the city. 4. Coordinate any owner-builder declaration or permit transfer requirements if applicable. 5. Pay fees per master fee schedule and building payment rules. 6. Schedule inspections by phone before 4:00 p.m.
04 How long does it take to get a building permit in Herriman, UT?
Building permit processing times in Herriman, UT typically run No fixed review time clearly posted.. Timelines can vary based on project complexity and current department workload.
05 What work is exempt from building permits in Herriman, UT?
Not all construction work requires a permit in Herriman, UT. The following work is generally exempt: Fences up to 7 feet high, subject to clear-view and taller-fence rules; Swings and playground equipment for residence; Decks with walking surface up to 30 inches above finished ground, unless serving required exit or triggering code/zoning review; One-story detached garages, sheds, playhouses, pergolas, similar buildings 200 square feet or less, unless utilities added; Prefabricated above-ground swimming pools not exceeding 2 feet depth; Portable spa with cord and plug, not hard-wired; Window awnings projecting no more than 54 inches; Repair/maintenance of electrical and mechanical systems, except furnace, AC, water heater; Adding a layer of shingles, subject to city reroof limits. When in doubt, confirm with the local building department before starting work.
06 How do I schedule a building inspection in Herriman, UT?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Herriman, UT via: 801-446-5327 before 4:00 p.m.. Before 4:00 p.m..
last verified April 2026 source Building Department, Herriman City ↗ entry id permits/utah/salt-lake/herriman

Educational reference. Permit rules and fees change — confirm current requirements directly with Building Department, Herriman City before applying. Jaspector is not legal advice.