On this page 6
When a permit is required
Permit triggers and exempt work for Herriman
Most construction work requires a permit and inspections by the Building Department.
- Exempt Fences up to 7 feet high, subject to clear-view and taller-fence rules
- Exempt Swings and playground equipment for residence
- Exempt Decks with walking surface up to 30 inches above finished ground, unless serving required exit or triggering code/zoning review
- Exempt One-story detached garages, sheds, playhouses, pergolas, similar buildings 200 square feet or less, unless utilities added
- Exempt Prefabricated above-ground swimming pools not exceeding 2 feet depth
- Exempt Portable spa with cord and plug, not hard-wired
- Exempt Window awnings projecting no more than 54 inches
- Exempt Repair/maintenance of electrical and mechanical systems, except furnace, AC, water heater
- Exempt Adding a layer of shingles, subject to city reroof limits
- Permit application materials for selected project type
- Owner-builder declaration when applicable
- Project-specific forms and submittal pages
- Building code
- Herriman provides a Building Codes and Design Criteria page and administers Utah-adopted codes with city requirements.
- Permit validity
- Not clearly posted.
- Owner-builder
- Herriman has a dedicated Owner/Builder Declaration page.
- Contractor requirements
- Utah licensing applies; city materials emphasize licensed teams and code compliance.
Application process
Typical processing: No fixed review time clearly posted.
- 01 Review Herriman's Building and Building Permits pages.
- 02 Select the applicable permit application and project page from city building resources.
- 03 Submit permit application materials and supporting documents to the city.
- 04 Coordinate any owner-builder declaration or permit transfer requirements if applicable.
- 05 Pay fees per master fee schedule and building payment rules.
- 06 Schedule inspections by phone before 4:00 p.m.
Typical processing time: No fixed review time clearly posted.
Fee schedule
Herriman building permit fees
Payments over $1,000 may be made by phone with electronic check; $1,000 and less can be made with Visa, Mastercard, Discover, or American Express.
Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.
Required inspections
Scheduling and sequence
- 801-446-5327 before 4:00 p.m. (phone)
- Scheduling deadline
- Before 4:00 p.m.
- Inspection hours
- 7:30 a.m. to 5:30 p.m. Monday-Friday
Typical sequence: Permit-specific inspections coordinated by Building Department until final approval.
Frequently asked
Common questions about Herriman permits
01 Do I need a building permit in Herriman, UT? ▸
02 How much does a building permit cost in Herriman, UT? ▸
03 How do I apply for a building permit in Herriman, UT? ▸
04 How long does it take to get a building permit in Herriman, UT? ▸
05 What work is exempt from building permits in Herriman, UT? ▸
06 How do I schedule a building inspection in Herriman, UT? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Building Department, Herriman City before applying. Jaspector is not legal advice.