On this page 5
When a permit is required
Permit triggers and exempt work for Grantham
New construction; additions; alterations; accessory structures; new buildings on Class VI roads (separate policy applies); projects near wetlands or shorelines require concurrent NHDES approval.
Note: Not published in searchable detail; contact Building Inspector for determination. NH baseline exemptions (ordinary repairs, painting, landscaping) apply.
- Completed building permit application
- Sketch or plan with construction details and elevations
- Location of building and septic
- NHDES approval if applicable
- Building code
- NH State Building Code (RSA 155-A).
- Contractor requirements
- NH-licensed electricians and plumbers required; no state GC license in NH.
Application process
Application → plan check → issuance → inspection → final
- 01 Download Building Permit Application from the town website.
- 02 Complete all questions on the application, even those that may not appear to apply to the project.
- 03 Prepare construction plans: include a sketch or plan of the proposed building with construction details, elevations, and location of building and septic; small projects may use a simple sketch.
- 04 If project is near a wetland or shoreline, obtain NHDES approval before submitting building permit application (NHDES approval required before permit can be accepted).
- 05 Use the town's GIS/aerial view tool to verify property lot lines and zoning setback compliance before submitting.
- 06 Submit completed application with fee to the Building Inspector at 300 Route 10 South.
- 07 Building Inspector reviews application.
- 08 Permit issued upon approval; post on job site.
- 09 Schedule required inspections; building inspector conducts site visits throughout the year.
- 10 Final inspection; Certificate of Occupancy upon completion.
Required inspections
Scheduling and sequence
- Contact Building Inspector at town office (phone)
- Inspection hours
- Town Clerk/Tax Collector open Monday through Thursday 8:00 AM to 5:00 PM; Friday 8:00 AM to 12:00 PM and 1:00 PM to 4:00 PM. Selectmen's office hours: Monday through Friday 8:00 AM to 4:00 PM.
Typical sequence: Foundation, framing, rough-in, final inspection; Certificate of Occupancy.
Frequently asked
Common questions about Grantham permits
01 Do I need a building permit in Grantham, NH? ▸
02 How do I apply for a building permit in Grantham, NH? ▸
03 How do I schedule a building inspection in Grantham, NH? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Building Inspector / Town Clerk Office before applying. Jaspector is not legal advice.