On this page 6
When a permit is required
Permit triggers and exempt work for Worden
Most construction, additions, remodels, structural changes, fences, decks.
- Exempt Cosmetic finishes (painting, tiling, carpeting)
- Exempt Minor fixture replacement (faucets/switches)
- Exempt Accessory structures under 200 sq ft (building permit exempt; zoning setback review still required)
- Exempt Low-height fences (under 6 ft) may only require zoning review
- Application form
- Site plan
- Construction drawings
- Building code
- 2012 IBC/IRC (Updating to 2025 mandate)
- Owner-builder
- Generally permitted for primary residence.
Application process
Application → plan check → issuance → inspection → final
- 01 Submit permit application at Worden Village Hall.
- 02 Provide site plan (plat of survey) and construction drawings.
- 03 Village Building Inspector reviews for zoning (setbacks/lot coverage) and safety.
- 04 Pay fees upon approval.
- 05 Schedule inspections at key milestones.
Fee schedule
Worden building permit fees
Contact (618) 459-3244 for quotes
Required inspections
Scheduling and sequence
- (618) 459-3244 (phone)
- Inspection hours
- Monday - Friday, 8:00 AM - 4:00 PM
Typical sequence: Footing, Framing, Rough-in, Final
Frequently asked
Common questions about Worden permits
01 Do I need a building permit in Worden, IL? ▸
02 How much does a building permit cost in Worden, IL? ▸
03 How do I apply for a building permit in Worden, IL? ▸
04 What work is exempt from building permits in Worden, IL? ▸
05 How do I schedule a building inspection in Worden, IL? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Village Hall / Permit Office before applying. Jaspector is not legal advice.