City building permits

City of Venice

How to apply for a building permit in City of Venice, Illinois. Permit authority, application steps, fees, and inspection requirements.

Code adoption
2025 Statewide Mandate (IBC/IRC/IEBC)
Min. permit fee
Valuation-based
Last verified
April 2026
On this page 6
§ 01

Permit authority

Building and Planning Department

Street address
329 Broadway, Venice, IL 62090
Coverage
City of Venice limits.
§ 02

When a permit is required

Permit triggers and exempt work for Venice

Structural changes, new construction, major system installations (electric/plumbing/HVAC), detached garages, sheds, pools, demolition.

Interior finishes (painting, wallpapering, carpeting, tiling)
Kitchen cabinets/vanities (no plumbing moves)
Minor landscaping (trees/shrubs)
Like-for-like appliance replacement
  • Exempt Interior finishes (painting, wallpapering, carpeting, tiling)
  • Exempt Kitchen cabinets/vanities (no plumbing moves)
  • Exempt Minor landscaping (trees/shrubs)
  • Exempt Like-for-like appliance replacement
Required documents
  • Application form
  • Site plans
  • Blueprints
  • Contractor registration
Building code
2025 Statewide Mandate (IBC/IRC/IEBC)
Owner-builder
Generally permitted for primary residence.
Contractor requirements
Contractors must be registered and insured.
§ 03

Application process

Application → plan check → issuance → inspection → final

  1. 01
    Submit application to the Venice Permit Office at City Hall.
  2. 02
    Provide site plans/plat of survey and construction drawings.
  3. 03
    Larger projects require architect-stamped blueprints.
  4. 04
    Review for zoning and code compliance.
  5. 05
    Schedule inspections at foundation, framing, and rough-in stages.
§ 04

Fee schedule

Venice building permit fees

Fee type
Amount
01
Minimum permit fee
Valuation-based
02
Permit fee formula
Based on project valuation or square footage
03
Penalty (no permit)
Double fees for work started without permit

Contact (618) 877-3586 for quotes

§ 05

Required inspections

Scheduling and sequence

How to schedule
  • (618) 877-3586 (phone)
Inspection hours
Monday - Friday, 8:00 AM - 4:00 PM

Typical sequence: Foundation, Framing, Rough-ins, Final

§ 06

Frequently asked

Common questions about Venice permits

01 Do I need a building permit in Venice, IL? ▸
Structural changes, new construction, major system installations (electric/plumbing/HVAC), detached garages, sheds, pools, demolition.
02 How much does a building permit cost in Venice, IL? ▸
Building permit fees in Venice, IL are set by the local building department and vary by project type and valuation. The minimum permit fee is Valuation-based. Fees are calculated as: Based on project valuation or square footage.
03 How do I apply for a building permit in Venice, IL? ▸
To apply for a building permit in Venice, IL, follow these steps: 1. Submit application to the Venice Permit Office at City Hall. 2. Provide site plans/plat of survey and construction drawings. 3. Larger projects require architect-stamped blueprints. 4. Review for zoning and code compliance. 5. Schedule inspections at foundation, framing, and rough-in stages.
04 What work is exempt from building permits in Venice, IL? ▸
Not all construction work requires a permit in Venice, IL. The following work is generally exempt: Interior finishes (painting, wallpapering, carpeting, tiling); Kitchen cabinets/vanities (no plumbing moves); Minor landscaping (trees/shrubs); Like-for-like appliance replacement. When in doubt, confirm with the local building department before starting work.
05 How do I schedule a building inspection in Venice, IL? ▸
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Venice, IL via: (618) 877-3586.
last verified April 2026 entry id permits/illinois/madison/venice

Educational reference. Permit rules and fees change — confirm current requirements directly with Building and Planning Department before applying. Jaspector is not legal advice.