On this page 6
When a permit is required
Permit triggers and exempt work for Edwardsville
New construction, remodeling (moving walls, changing systems), roofs, fences, pools, retaining walls, parking lots.
- Exempt Painting, carpeting, tiling, and minor cosmetic repairs
- Exempt Sheds/accessory structures under 100 sq ft (Permit required but fee is $0)
- Exempt Retaining walls (Permit required but fee is $0; engineering required over 4ft)
- Site plan
- Structural plans
- Energy calculations
- Plumbing/electrical diagrams
- Building code
- 2021 IBC, 2021 IRC, 2020 NEC
- Permit validity
- 1 year from issuance; expires if work suspended for 6 months.
- Owner-builder
- Homeowners may perform work on primary residence.
- Contractor requirements
- Contractors must be registered. State licenses required for roofing, plumbing, electrical.
Application process
Typical processing: Approximately 11 working days for plan review.
- 01 Obtain permit application from Public Works or download online.
- 02 Submit completed application, site plan, and two sets of construction plans.
- 03 Plan review by Public Works and Fire Department (if commercial/life safety).
- 04 Pay fees and collect permit.
Typical processing time: Approximately 11 working days for plan review.
Source: Public Works Department ↗
Fee schedule
Edwardsville building permit fees
Payments made at Public Works office
Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.
Required inspections
Scheduling and sequence
- (618) 692-7535 (phone)
- Scheduling deadline
- Call before 9:30 AM for same-day inspection.
- Inspection hours
- Monday - Friday, 8:00 AM - 4:30 PM
Typical sequence: Footing, Foundation, Rough-ins, Framing, Insulation, Final
Frequently asked
Common questions about Edwardsville permits
01 Do I need a building permit in Edwardsville, IL? ▸
02 How much does a building permit cost in Edwardsville, IL? ▸
03 How do I apply for a building permit in Edwardsville, IL? ▸
04 How long does it take to get a building permit in Edwardsville, IL? ▸
05 What work is exempt from building permits in Edwardsville, IL? ▸
06 How do I schedule a building inspection in Edwardsville, IL? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Public Works Department before applying. Jaspector is not legal advice.