jaspector
City building permits

City of Troy

How to apply for a building permit in City of Troy, Illinois. Permit authority, application steps, fees, and inspection requirements.

Code adoption
2021 IBC, 2021 IRC, 2020 NEC (Effective June 2025)
Min. permit fee
$50 (Limited Use)
Last verified
April 2026
On this page 6
§ 01

Permit authority

Building & Zoning Department

Street address
116 E. Market Street, Troy, IL 62294
Coverage
City of Troy limits.
Online portal
Building & Zoning
Email/Manual submission
§ 02

When a permit is required

Permit triggers and exempt work for Troy

New construction, additions, renovations, structural changes, fences, pools, solar panels, demolition.

Cosmetic improvements (painting, flooring, cabinets)
Minor non-structural repairs
Fence maintenance (board replacement)
  • Exempt Cosmetic improvements (painting, flooring, cabinets)
  • Exempt Minor non-structural repairs
  • Exempt Fence maintenance (board replacement)
Required documents
  • Application form
  • Site plans
  • Construction drawings
Building code
2021 IBC, 2021 IRC, 2020 NEC (Effective June 2025)
Owner-builder
Generally permitted for primary residence.
Contractor requirements
Contractors must be registered.
§ 03

Application process

Application → plan check → issuance → inspection → final

  1. 01
    Pre-consultation with the department is recommended.
  2. 02
    Submit application (Residential, Commercial, or Limited Use) and plans to buildingzoning@troyil.us.
  3. 03
    Review for code and zoning compliance.
  4. 04
    Pay fees upon approval.

Source: Building & Zoning Department ↗

§ 04

Fee schedule

Troy building permit fees

Fee type
Amount
01
Minimum permit fee
$50 (Limited Use)
02
Plan check fee
Included in permit fee
03
Permit fee formula
$50 flat fee for Limited Use; others based on sq ft or valuation (approx. $0.15/sq ft for new residential)
04
Penalty (no permit)
Double fees for work started without permit

Payments made at City Hall

Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.

§ 05

Required inspections

Scheduling and sequence

How to schedule
  • (618) 667-8734 (phone)
Scheduling deadline
24-hour notice required (48 hours for Limited Use)

Typical sequence: Rough-in, Final

§ 06

Frequently asked

Common questions about Troy permits

01 Do I need a building permit in Troy, IL? ▸
New construction, additions, renovations, structural changes, fences, pools, solar panels, demolition.
02 How much does a building permit cost in Troy, IL? ▸
Building permit fees in Troy, IL are set by the local building department and vary by project type and valuation. The minimum permit fee is $50 (Limited Use). Fees are calculated as: $50 flat fee for Limited Use; others based on sq ft or valuation (approx. $0.15/sq ft for new residential). Plan check fee: Included in permit fee.
03 How do I apply for a building permit in Troy, IL? ▸
To apply for a building permit in Troy, IL, follow these steps: 1. Pre-consultation with the department is recommended. 2. Submit application (Residential, Commercial, or Limited Use) and plans to buildingzoning@troyil.us. 3. Review for code and zoning compliance. 4. Pay fees upon approval.
04 What work is exempt from building permits in Troy, IL? ▸
Not all construction work requires a permit in Troy, IL. The following work is generally exempt: Cosmetic improvements (painting, flooring, cabinets); Minor non-structural repairs; Fence maintenance (board replacement). When in doubt, confirm with the local building department before starting work.
05 How do I schedule a building inspection in Troy, IL? ▸
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Troy, IL via: (618) 667-8734. 24-hour notice required (48 hours for Limited Use).
last verified April 2026 source Building & Zoning Department ↗ entry id permits/illinois/madison/troy

Educational reference. Permit rules and fees change — confirm current requirements directly with Building & Zoning Department before applying. Jaspector is not legal advice.