On this page 6
When a permit is required
Permit triggers and exempt work for Wood River
New construction, additions, alterations, fences, pools, sheds, garages, decks.
- Exempt Painting, papering, tiling, carpeting
- Exempt Cabinets, countertops, and similar finish work
- Exempt Routine minor repairs (non-structural)
- Two sets of plans (sealed by architect for new homes)
- Site plan with setbacks
- Building code
- 2021 IBC, 2021 IRC, 2020 NEC
- Permit validity
- 12 months from issuance.
- Owner-builder
- Permitted for primary residence.
- Contractor requirements
- Contractors must be registered.
Application process
Application → plan check → issuance → inspection → final
- 01 Obtain permit application from City Hall or download online.
- 02 Submit application with two sets of signed/sealed plans (for new residential).
- 03 Site plans required for additions, sheds, decks, etc.
- 04 Department reviews for code and zoning adherence.
- 05 Pay fees and receive permit.
Source: Building and Zoning Department ↗
Fee schedule
Wood River building permit fees
Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.
Required inspections
Scheduling and sequence
- (618) 251-3100 (phone)
- Inspection hours
- Monday - Friday, 8:00 AM - 5:00 PM
Typical sequence: Footing (size/setback and pour), Rough-in, Final
Frequently asked
Common questions about Wood River permits
01 Do I need a building permit in Wood River, IL? ▸
02 How much does a building permit cost in Wood River, IL? ▸
03 How do I apply for a building permit in Wood River, IL? ▸
04 What work is exempt from building permits in Wood River, IL? ▸
05 How do I schedule a building inspection in Wood River, IL? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Building and Zoning Department before applying. Jaspector is not legal advice.