When a permit is required
Permit triggers and exempt work for Bicknell
Any construction, addition, alteration, repair, demolition, relocation, or change of occupancy of a building or structure within Bicknell requires a building permit. The Town's Building Regulations Ordinance (No. 10-6-2016) governs permit requirements.
Note: Statewide IRC/IBC exemptions apply. Contact the town office or refer to the Building Regulations Ordinance for Bicknell-specific exemptions and thresholds.
- Completed building permit application
- Site plan
- Construction drawings
- DOPL Owner/Builder Certification Agreement, if owner-builder
- Contractor license verification, if licensed contractor
- Building code
- 2021 IBC, 2021 IRC, 2021 IMC, 2021 IPC, 2021 IFGC, 2021 IECC, NEC 2020, per Utah Title 15A. Confirm whether Bicknell has adopted any local amendments by contacting the town office.
- Permit validity
- Statewide standard: permits expire if work does not commence within 180 days of issuance or is abandoned for 180 days after commencement. Confirm with the town office.
- Owner-builder
- Owner-builders are allowed under statewide law. Notarized DOPL Owner/Builder Certification Agreement is required with permit application.
- Contractor requirements
- Utah DOPL state license required for work valued at $3,000 or more.
Application process
Application → plan check → issuance → inspection → final
- 01 Contact the Bicknell Town Office at 435-425-2215 or kelseybicknellutah@gmail.com to request the building permit application form and any current requirements checklist.
- 02 Review the Town's Building Regulations Ordinance (Ordinance No. 10-6-2016), available at https://www.bicknellutah.com/ordinances.html.
- 03 Prepare required construction documents: site plan and construction drawings appropriate to project scope.
- 04 Complete the building permit application.
- 05 If owner-building, prepare the notarized DOPL Owner/Builder Certification Agreement.
- 06 Submit completed application and supporting documents to the town office in person.
- 07 Await review and approval. Pay applicable permit fee.
- 08 Receive issued permit. Post permit card on site; keep approved plans on site throughout construction.
- 09 Schedule and pass all required inspections.
- 10 Obtain final inspection approval and Certificate of Occupancy before occupying any new or substantially altered structure.
Required inspections
Scheduling and sequence
- 435-425-2215 (phone)
Typical sequence: Typical sequence: footings, foundation, rough-in (framing, electrical, plumbing, mechanical), insulation, and final inspection. If inspections are performed by the Wayne County Building Inspector, contact 435-836-1302.
Frequently asked
Common questions about Bicknell permits
01 Do I need a building permit in Bicknell, UT? ▸
02 How do I apply for a building permit in Bicknell, UT? ▸
03 How do I schedule a building inspection in Bicknell, UT? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Bicknell Town Office / Town Council before applying. Jaspector is not legal advice.