When a permit is required
Permit triggers and exempt work for Wayne County
Any new construction, addition, alteration, repair, demolition, relocation, or change of occupancy of a building or structure requires a building permit.
- Exempt Ordinary maintenance and repair not affecting structural systems, life safety systems, or regulated mechanical/electrical/plumbing systems
- Exempt Painting, papering, tiling, carpeting, and similar finish work
- Exempt Replacement of existing fixtures or appliances in-kind without structural or code-level changes
- Exempt Minor repairs to existing roofing without structural alteration
- Exempt Fences not exceeding 6 feet in height
- Exempt Portable structures under applicable square footage thresholds
- Exempt Sheds under 200 square feet (typically exempt across Utah)
Note: Permit exemption does not override zoning setback, height, or lot coverage requirements. Contact the Planning & Zoning office for zoning compliance obligations even on exempt structures.
- Completed building permit application
- Site plan/plot plan showing parcel dimensions, proposed structure location, setbacks, easements, and drainage
- Construction drawings appropriate to project type
- Letter of water approval from nearest city/town water system or approved private well permit from Utah Division of Water Rights
- Wastewater feasibility study (septic approval) from Central Utah Public Health Department
- Road encroachment permit from Wayne County Road Department or UDOT, if applicable
- DOPL Owner/Builder Certification Agreement, if owner-builder
- Building code
- 2021 IBC, 2021 IRC, 2021 IMC, 2021 IPC, 2021 IFGC, 2021 IECC, 2021 IEBC, NEC 2020, and Utah Wildland Urban Interface Code, per Utah Title 15A (effective November 1, 2023).
- Permit validity
- Standard Utah practice: permits expire if construction does not start within 180 days of issuance, or if construction is abandoned for 180 days after commencement. Confirm exact policy with the Building Department.
- Owner-builder
- Owner-builders are allowed under statewide law (Utah Code Section 58-55-305). Notarized DOPL Owner/Builder Certification Agreement is required with permit application. County registers owner-builder with DOPL at permit issuance.
- Contractor requirements
- Utah DOPL state license required for all construction work valued at $3,000 or more. Contractor must provide license verification at permit application.
Source: Wayne County Planning and Zoning / Wayne County Building Department ↗
Application process
Application → plan check → issuance → inspection → final
- 01 Download the Building Permit Application from https://waynecountyutah.gov/documents or pick it up in person at the Wayne County Courthouse.
- 02 Consult the Wayne County Administrative Manual for the complete checklist of required materials and submittal requirements.
- 03 Prepare required supporting documents: water approval letter or private well permit, wastewater feasibility study (septic approval), road encroachment permit if applicable, plot plan/site plan, and construction drawings.
- 04 Complete the Building Permit Application form.
- 05 If owner-building, prepare the notarized DOPL Owner/Builder Certification Agreement.
- 06 Submit completed application and all supporting documents in person at the Wayne County Courthouse or by mail to P.O. Box 189, Loa, UT 84747.
- 07 Plans are reviewed by the Building Inspector. Staff may request corrections or additional information.
- 08 Pay permit fee upon approval based on project valuation.
- 09 Receive issued permit. Post the permit card on the job site and keep approved plans on site throughout construction.
- 10 Schedule required inspections by contacting the Building Department at 435-836-1302.
- 11 Pass all required inspections in sequence.
- 12 Obtain final inspection approval and Certificate of Occupancy before occupying the structure.
Source: Wayne County Planning and Zoning / Wayne County Building Department ↗
Fee schedule
Wayne County building permit fees
Wayne County does not publish a standalone fee schedule online. Contact the Building Department at 435-836-1302 for current fee amounts.
Required inspections
Scheduling and sequence
- 435-836-1302 (phone)
- Scheduling deadline
- Call in advance of the needed inspection date. Contact the department for required lead time.
- Inspection hours
- Monday through Friday, 8:00 a.m. to 5:00 p.m. (closed 12:30 p.m. to 1:00 p.m. for lunch)
Typical sequence: Typical sequence: footing inspection, foundation inspection, rough-in inspections (framing, electrical, plumbing, mechanical), insulation inspection, and final inspection. All work must remain accessible and exposed until approved.
Source: Wayne County Planning and Zoning / Wayne County Building Department ↗
Frequently asked
Common questions about unincorporated Wayne County permits
01 Do I need a building permit in unincorporated Wayne County, UT? ▸
02 How much does a building permit cost in unincorporated Wayne County, UT? ▸
03 How do I apply for a building permit in unincorporated Wayne County, UT? ▸
04 What work is exempt from building permits in unincorporated Wayne County, UT? ▸
05 How do I schedule a building inspection in unincorporated Wayne County, UT? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Wayne County Planning and Zoning / Wayne County Building Department before applying. Jaspector is not legal advice.