When a permit is required
Permit triggers and exempt work for Coalville
Coalville requires a permit for construction, enlargement, alteration, repair, movement, improvement, removal, conversion, or demolition of buildings or structures.
Note: A public Coalville exemption list was not clearly posted in the reviewed permit materials. Applicants should verify Utah State Construction Code permit exemptions with Coalville before treating work as exempt.
- Application
- Three complete sets of construction plans
- One electronic copy emailed to cityhall@coalvillecity.gov
- Site plan
- Structural plans and calculations as required
- Project clearance and utility approvals as applicable
- Driveway, erosion, grading, or floodplain items if applicable
- Building code
- Coalville fee schedule references commercial structures under the IBC and residential structures under the IRC. Utah State Construction Code applies, subject to local amendments.
- Owner-builder
- No separate owner-builder instruction sheet was identified.
- Contractor requirements
- Utah state contractor licensing through DOPL applies; Coalville also requests contractor information on permit materials.
Application process
Application → plan check → issuance → inspection → final
- 01 Obtain the Coalville building permit application and review procedure packet.
- 02 Submit application materials including required paper plan sets, an electronic set to cityhall@coalvillecity.gov, and project-specific supporting approvals.
- 03 Staff checks for zoning compliance and routes the project to the building official and other departments as needed.
- 04 Corrections or additional items are returned to the applicant if needed.
- 05 After approvals, Coalville computes permit and related fees under the city fee schedule.
- 06 Pay issuance fees, impact and utility fees as applicable, and receive the permit.
- 07 Complete required inspections and obtain final approvals and occupancy documentation if applicable.
Fee schedule
Coalville building permit fees
City fees, impact fees, utility fees, and bonds may be due before issuance depending on project scope.
Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.
Required inspections
Scheduling and sequence
- (435) 336-5981 (phone)
Typical sequence: Sequence depends on scope; Coalville public materials indicate construction inspections, utility or encroachment inspections, and final approvals may all apply depending on the project.
Frequently asked
Common questions about Coalville permits
01 Do I need a building permit in Coalville, UT? ▸
02 How much does a building permit cost in Coalville, UT? ▸
03 How do I apply for a building permit in Coalville, UT? ▸
04 How do I schedule a building inspection in Coalville, UT? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Coalville City Building Department before applying. Jaspector is not legal advice.