On this page 5
When a permit is required
Permit triggers and exempt work for Ware Shoals (Abbeville County Portion)
Building permits required for construction within Town of Ware Shoals.
- Exempt Owner-Builder Exemption available under SC state law
- Exempt Mobile home permit fee: $5.00 (Abbeville County portion; may differ in Greenwood County)
Note: Ware Shoals Code of Ordinances Chapter 8 governs building and use regulations. Verify property location before applying; different systems for Abbeville and Greenwood counties.
- Building permit application
- Construction drawings
- Plat of property
- Site plan with drainage and landscape plans
- Contractor license (if applicable)
- Owner-Builder Disclosure (if applicable)
- Zoning compliance documentation
- SCDHEC septic permit (if applicable)
- Building code
- 2021 South Carolina Building Code (based on 2021 IBC); 2021 IRC for residential; 2018 IECC with state amendments.
- Owner-builder
- Owner-builder exemption available under SC state law for one-family/two-family personal residences.
- Contractor requirements
- SC Contractor's Licensing Board requirements apply.
Application process
Typical processing: 1-2 days for plan review (Abbeville portion).
- 01 Confirm property location with Town of Ware Shoals (verify Abbeville or Greenwood County).
- 02 For Abbeville County properties: Contact Abbeville County Building Department (864-366-2400).
- 03 For Greenwood County properties: Use Greenwood County online permit system.
- 04 Prepare completed building permit application.
- 05 Prepare construction drawings and site documentation.
- 06 Prepare plat of property.
- 07 Verify compliance with Ware Shoals Code of Ordinances Chapter 8.
- 08 Obtain contractor's license if applicable.
- 09 Prepare Owner-Builder Disclosure Statement if applicable.
- 10 Obtain Zoning Compliance Signature from respective county.
- 11 Apply for SCDHEC septic permit if applicable (required before building permit).
- 12 Submit documentation and pay fees.
Typical processing time: 1-2 days for plan review (Abbeville portion).
Required inspections
Scheduling and sequence
- 864-366-2400 (phone)
- Scheduling deadline
- 24-hour notice required (Abbeville County portion).
Typical sequence: Required inspections: Foundation, Framing, Electrical, Plumbing, Mechanical, Final occupancy.
Frequently asked
Common questions about Ware Shoals (Abbeville County Portion) permits
01 Do I need a building permit in Ware Shoals (Abbeville County Portion), SC? ▸
02 How do I apply for a building permit in Ware Shoals (Abbeville County Portion), SC? ▸
03 How long does it take to get a building permit in Ware Shoals (Abbeville County Portion), SC? ▸
04 What work is exempt from building permits in Ware Shoals (Abbeville County Portion), SC? ▸
05 How do I schedule a building inspection in Ware Shoals (Abbeville County Portion), SC? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Abbeville County Building Department before applying. Jaspector is not legal advice.