On this page 5
When a permit is required
Permit triggers and exempt work for Donalds
Building permits required for construction in Town of Donalds.
- Exempt Owner-Builder Exemption available under state law
- Exempt Mobile home permit fee: $5.00
Note: Donalds Zoning Ordinance enforces standards to reduce street congestion, ensure fire and safety standards, promote public health and welfare, and protect property against blight and depreciation.
- Completed building permit application
- Construction plans and drawings
- Plat of property
- Contractor's license (if applicable)
- Owner-Builder Disclosure Statement (if non-licensed owner-builder)
- Zoning compliance documentation
- SCDHEC septic permit (if applicable)
- Building code
- 2021 South Carolina Building Code (based on 2021 IBC); 2021 IRC for residential; 2018 IECC with state amendments.
- Owner-builder
- Owner-builder exemption available under state law for one-family/two-family personal residences.
- Contractor requirements
- SC Contractor's Licensing Board license required per state thresholds.
Application process
Typical processing: 1-2 days for plan review.
- 01 Contact Abbeville County Building Department for permit application.
- 02 Prepare completed building permit application.
- 03 Prepare construction plans and drawings.
- 04 Prepare plat of property.
- 05 Obtain contractor's license if applicable.
- 06 Prepare Owner-Builder Disclosure Statement if non-licensed owner-builder.
- 07 Verify compliance with Donalds Zoning Ordinance and Zoning Map.
- 08 Obtain Zoning Compliance Signature from Abbeville County Zoning Department.
- 09 Apply for SCDHEC septic permit if applicable (required before building permit).
- 10 Submit permit application and documentation in person.
- 11 County staff reviews application (typical 1-2 day plan review).
- 12 Pay permit fees and obtain building permit.
Typical processing time: 1-2 days for plan review.
Required inspections
Scheduling and sequence
- 864-366-2400 (phone)
- Scheduling deadline
- 24-hour minimum notice required.
Typical sequence: Required inspections: Structure/foundation, Electrical, Plumbing, Mechanical/HVAC, and Final occupancy.
Frequently asked
Common questions about Donalds permits
01 Do I need a building permit in Donalds, SC? ▸
02 How do I apply for a building permit in Donalds, SC? ▸
03 How long does it take to get a building permit in Donalds, SC? ▸
04 What work is exempt from building permits in Donalds, SC? ▸
05 How do I schedule a building inspection in Donalds, SC? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Abbeville County Building Department before applying. Jaspector is not legal advice.