On this page 5
When a permit is required
Permit triggers and exempt work for Lowndesville
Building permits required for construction in Town of Lowndesville.
- Exempt Owner-Builder Exemption available under state law
- Exempt Mobile home permit fee: $5.00
Note: Local building/zoning official (Travis Lathren) coordinates with county department for town-specific requirements.
- Building permit application
- Construction drawings
- Plat of property
- Contractor's license (if applicable)
- Owner-Builder Disclosure (if non-licensed)
- Zoning compliance
- SCDHEC septic permit (if applicable)
- Building code
- 2021 South Carolina Building Code (based on 2021 IBC); 2021 IRC for residential; 2018 IECC with state amendments.
- Owner-builder
- Owner-builder exemption available under state law for one-family/two-family personal residences. Requires disclosure statement and Register of Deeds filing.
- Contractor requirements
- SC Contractor's Licensing Board requirements apply.
Application process
Typical processing: 1-2 days for plan review.
- 01 Contact Abbeville County Building Department to obtain permit application.
- 02 For town-specific requirements, contact Town of Lowndesville building/zoning official (Travis Lathren, 942-8424).
- 03 Prepare completed building permit application.
- 04 Prepare construction drawings and plans.
- 05 Prepare plat of property.
- 06 Obtain contractor's license if applicable.
- 07 Prepare Owner-Builder Disclosure Statement if non-licensed owner-builder.
- 08 Obtain Zoning Compliance Signature from Abbeville County Zoning Department.
- 09 Apply for SCDHEC septic permit if applicable (required before building permit).
- 10 Submit permit application and documentation in person at Abbeville County Building Department.
- 11 County staff reviews application (typical 1-2 day plan review).
- 12 Pay permit fees and obtain building permit.
Typical processing time: 1-2 days for plan review.
Required inspections
Scheduling and sequence
- 864-366-2400 (phone)
- Scheduling deadline
- 24 hours minimum notice required.
Typical sequence: Required inspections: Foundation/structure, Electrical, Plumbing, Mechanical/HVAC, and Final occupancy.
Frequently asked
Common questions about Lowndesville permits
01 Do I need a building permit in Lowndesville, SC? ▸
02 How do I apply for a building permit in Lowndesville, SC? ▸
03 How long does it take to get a building permit in Lowndesville, SC? ▸
04 What work is exempt from building permits in Lowndesville, SC? ▸
05 How do I schedule a building inspection in Lowndesville, SC? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Abbeville County Building Department before applying. Jaspector is not legal advice.