When a permit is required
Permit triggers and exempt work for Due West
Building permits required for construction in Town of Due West.
- Exempt Owner-Builder Exemption available for one-family/two-family personal residences
- Exempt Mobile home permit fee: $5.00
Note: Due West may enforce slightly different contractor licensing thresholds; verify with town. Two-year sale/rent prohibition applies to owner-builder exemptions.
- Building permit application
- Construction drawings
- Plat of property
- Contractor's license (if applicable)
- Owner-Builder Disclosure (if owner-builder)
- Zoning compliance
- SCDHEC septic permit (if applicable)
- Building code
- 2021 South Carolina Building Code (based on 2021 IBC); 2021 IRC for residential; 2018 IECC with state amendments.
- Owner-builder
- Non-licensed owner may construct one-family or two-family residence for personal use. Disclosure statement and Register of Deeds filing required. Two-year sale/rent prohibition applies.
- Contractor requirements
- State license required for commercial work over $5,000 or residential work over $200. SC Contractor's Licensing Board.
Application process
Typical processing: 1-2 days for plan review.
- 01 Contact Abbeville County Building Department to obtain permit application.
- 02 Prepare completed building permit application.
- 03 Prepare construction drawings and site documentation.
- 04 Prepare plat of property.
- 05 Obtain contractor's license if applicable (Note: Due West may enforce $5,000 commercial and $200 residential thresholds).
- 06 Prepare Owner-Builder Disclosure Statement if non-licensed owner-builder.
- 07 Obtain Zoning Compliance Signature from Abbeville County Zoning Department.
- 08 Apply for SCDHEC septic permit if applicable (required before building permit).
- 09 Submit all documentation in person at Abbeville County Building Department.
- 10 County staff reviews application (typical 1-2 day plan review).
- 11 Pay permit fees and obtain building permit.
Typical processing time: 1-2 days for plan review.
Required inspections
Scheduling and sequence
- 864-366-2400 (phone)
- Scheduling deadline
- 24 hours minimum notice required.
Typical sequence: Required inspections: Foundation/structure, Electrical, Plumbing, Mechanical/HVAC, and Final.
Frequently asked
Common questions about Due West permits
01 Do I need a building permit in Due West, SC? ▸
02 How do I apply for a building permit in Due West, SC? ▸
03 How long does it take to get a building permit in Due West, SC? ▸
04 What work is exempt from building permits in Due West, SC? ▸
05 How do I schedule a building inspection in Due West, SC? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Abbeville County Building Department before applying. Jaspector is not legal advice.