When a permit is required
Permit triggers and exempt work for Cleona Borough
Permits are required for new dwellings, additions, manufactured homes, roofed porches and patios, decks over 30 inches high, accessory structures over UCC thresholds, structural alterations, stair changes, pools, hot tubs, solar, enclosed porches, and other UCC-regulated work.
- Exempt Replacement of roof shingles or other roof coverings
- Exempt Finishing an existing basement where no structural changes are involved
- Exempt Installation of a new furnace, water heater, air conditioner, or similar appliance
- Exempt Installation of a new generator (utility may still require electrical inspection)
- Exempt Building an unroofed deck less than 30 inches above grade
Note: Exempt from building permit does not mean exempt from zoning requirements. Confirm with Lebanon County Planning Department before proceeding.
- UCC application
- Readable construction plans
- Site information
- Zoning permit if required
- Trade details as applicable
- Building code
- Pennsylvania UCC using the 2018 I-Codes as amended.
- Permit validity
- The permit may become invalid if work does not start within 180 days, is inactive for 180 days, or is not completed within 5 years.
- Owner-builder
- Owner or authorized agent may sign the application.
- Contractor requirements
- Pennsylvania HICPA registration applies for covered home improvement work over $5,000.
Source: Lebanon County Planning Department, Building Code Administration ↗
Application process
Typical processing: 15 business days after a complete submission for residential code review.
- 01 Apply for zoning approval with LCPD if the project needs zoning review.
- 02 Submit the signed UCC application and PDF plans to lcpdreview@lebanoncountypa.gov, or drop off one paper set at Room 206, Municipal Building.
- 03 LCPD reviews residential work directly, quotes the fee, and issues the permit after payment.
- 04 Commercial code submissions are forwarded to CCIS after zoning processing.
Typical processing time: 15 business days after a complete submission for residential code review.
Source: Lebanon County Planning Department, Building Code Administration ↗
Fee schedule
Cleona Borough building permit fees
Check or cash per county worksheet.
Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.
Required inspections
Scheduling and sequence
- Call Heather at 717-304-4066 (phone)
- Scheduling deadline
- First-come, first-served; provide as much notice as possible.
- Inspection hours
- 7:30 a.m. to 3:30 p.m.
Typical sequence: Typical sequence: pre-formed or pre-stone if applicable, footer, under slab, foundation, framing, insulation, drywall where required, and final.
Source: Lebanon County Planning Department, Building Code Administration ↗
Frequently asked
Common questions about Cleona Borough permits
01 Do I need a building permit in Cleona Borough, PA? ▸
02 How much does a building permit cost in Cleona Borough, PA? ▸
03 How do I apply for a building permit in Cleona Borough, PA? ▸
04 How long does it take to get a building permit in Cleona Borough, PA? ▸
05 What work is exempt from building permits in Cleona Borough, PA? ▸
06 How do I schedule a building inspection in Cleona Borough, PA? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Lebanon County Planning Department, Building Code Administration before applying. Jaspector is not legal advice.