How to apply for a building permit in Cherry Hill Township, New Jersey. Permit authority, application steps, fees, and inspection requirements.

Code adoption
NJ Uniform Construction Code (UCC) per NJAC 5:23
Last verified
April 2026
On this page 6
§ 01

Permit authority

Code Enforcement Department

Street address
Municipal Building, 820 Mercer Street, Room 205, Cherry Hill, NJ 08002
Coverage
All properties within Cherry Hill Township.
Online portal
Permit Application Requirements
NJ Uniform Construction Code
§ 02

When a permit is required

Permit triggers and exempt work for Cherry Hill Township

A building permit is required for all construction work except ordinary repairs and minor work as defined by NJ UCC.

Ordinary repairs as defined by NJAC 5:23-2.7 (painting, wallpapering, replacement glass, interior trim, flooring material under 25% of room area)
Minor work as defined by NJAC 5:23-2.17A (porches/stoops without roof support, interior alterations without structural changes)
Garden-type utility sheds 200 sq ft or less, 10 feet or less in height, without utility connections
Fences 6 feet or less in height (except pool barriers)
Temporary structures under 120 sq ft for less than 180 days
  • Exempt Ordinary repairs as defined by NJAC 5:23-2.7 (painting, wallpapering, replacement glass, interior trim, flooring material under 25% of room area)
  • Exempt Minor work as defined by NJAC 5:23-2.17A (porches/stoops without roof support, interior alterations without structural changes)
  • Exempt Garden-type utility sheds 200 sq ft or less, 10 feet or less in height, without utility connections
  • Exempt Fences 6 feet or less in height (except pool barriers)
  • Exempt Temporary structures under 120 sq ft for less than 180 days

Note: Minor work requires a permit, but work may proceed before permit issuance. Confirm edge cases with Code Enforcement Department before proceeding.

Required documents
  • Completed NJ DCA permit application forms (F100 and applicable subcodes)
  • Construction prints: 2 sets for residential, 3 sets for commercial
  • Zoning approval (if applicable)
  • Property survey showing existing and proposed structures
  • Proof of contractor registration with NJ Division of Consumer Affairs
Building code
NJ Uniform Construction Code (UCC) per NJAC 5:23
Permit validity
12 months from the date of last inspection if work is started.
Owner-builder
Owner-builders may perform work on single-family dwellings; residential plans do not need to be professionally drawn.
Contractor requirements
All contractors must be registered with NJ Division of Consumer Affairs and provide proof of registration with permit application.

Source: Code Enforcement Department ↗

§ 03

Application process

Typical processing: Up to 20 business days depending on project volume and complexity.

  1. 01
    Obtain Zoning Permit approval from Zoning Department if required for the project.
  2. 02
    Complete NJ DCA Construction Permit Application (Form F100).
  3. 03
    Complete applicable subcode technical sections: Building (F110), Electrical (F120), Plumbing (F130), Fire (F140).
  4. 04
    Prepare required construction plans and documentation.
  5. 05
    For commercial projects, contact Code Enforcement to determine if Subdivision and Land Development Ordinance (SALDO) review is required.
  6. 06
    Submit application by mail to 820 Mercer Street, Construction Office, Cherry Hill, NJ 08002 or in-person at Room 205 of the Municipal Building.
  7. 07
    Code Enforcement reviews application; plan review period is up to 20 business days depending on volume and complexity.

Typical processing time: Up to 20 business days depending on project volume and complexity.

Source: Code Enforcement Department ↗

§ 04

Fee schedule

Cherry Hill Township building permit fees

Fee type
Amount
01
Plan check fee
Computed as percentage of construction permit fees; contact office for details.
02
Permit fee formula
Contact Construction Office at 856-488-7855 for current fee schedule. Fees based on type of work and/or retail value (material and labor).
§ 05

Required inspections

Scheduling and sequence

How to schedule
Scheduling deadline
24-hour advance notice required for all inspections.
Inspection hours
Monday-Friday (contact office for specific hours)
Time windows
Contact Code Enforcement Department for available inspection windows.

Typical sequence: Final inspections must be performed prior to occupancy. Certificate of Occupancy or Certificate of Continued Occupancy required before use. Progress inspections required at various construction stages.

Source: Code Enforcement Department ↗

§ 06

Frequently asked

Common questions about Cherry Hill Township permits

01 Do I need a building permit in Cherry Hill Township, NJ?
A building permit is required for all construction work except ordinary repairs and minor work as defined by NJ UCC.
02 How much does a building permit cost in Cherry Hill Township, NJ?
Building permit fees in Cherry Hill Township, NJ are set by the local building department and vary by project type and valuation. Fees are calculated as: Contact Construction Office at 856-488-7855 for current fee schedule. Fees based on type of work and/or retail value (material and labor).. Plan check fee: Computed as percentage of construction permit fees; contact office for details..
03 How do I apply for a building permit in Cherry Hill Township, NJ?
To apply for a building permit in Cherry Hill Township, NJ, follow these steps: 1. Obtain Zoning Permit approval from Zoning Department if required for the project. 2. Complete NJ DCA Construction Permit Application (Form F100). 3. Complete applicable subcode technical sections: Building (F110), Electrical (F120), Plumbing (F130), Fire (F140). 4. Prepare required construction plans and documentation. 5. For commercial projects, contact Code Enforcement to determine if Subdivision and Land Development Ordinance (SALDO) review is required. 6. Submit application by mail to 820 Mercer Street, Construction Office, Cherry Hill, NJ 08002 or in-person at Room 205 of the Municipal Building. 7. Code Enforcement reviews application; plan review period is up to 20 business days depending on volume and complexity.
04 How long does it take to get a building permit in Cherry Hill Township, NJ?
Building permit processing times in Cherry Hill Township, NJ typically run Up to 20 business days depending on project volume and complexity.. Timelines can vary based on project complexity and current department workload.
05 What work is exempt from building permits in Cherry Hill Township, NJ?
Not all construction work requires a permit in Cherry Hill Township, NJ. The following work is generally exempt: Ordinary repairs as defined by NJAC 5:23-2.7 (painting, wallpapering, replacement glass, interior trim, flooring material under 25% of room area); Minor work as defined by NJAC 5:23-2.17A (porches/stoops without roof support, interior alterations without structural changes); Garden-type utility sheds 200 sq ft or less, 10 feet or less in height, without utility connections; Fences 6 feet or less in height (except pool barriers); Temporary structures under 120 sq ft for less than 180 days. Note: Minor work requires a permit, but work may proceed before permit issuance. Confirm edge cases with Code Enforcement Department before proceeding. When in doubt, confirm with the local building department before starting work.
06 How do I schedule a building inspection in Cherry Hill Township, NJ?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Cherry Hill Township, NJ via: 856-488-7855, Cherry Hill Code Enforcement Department. 24-hour advance notice required for all inspections..
last verified April 2026 source Code Enforcement Department ↗ entry id permits/new-jersey/camden/cherry-hill-township

Educational reference. Permit rules and fees change — confirm current requirements directly with Code Enforcement Department before applying. Jaspector is not legal advice.

§   Adjacent

Other jurisdictions in Camden County.

Same county, different permit office. Click for that jurisdiction's full guide.

All Camden County jurisdictions →