jaspector
City building permits

Town of Peterborough

How to apply for a building permit in Town of Peterborough, New Hampshire. Permit authority, application steps, fees, and inspection requirements.

Avg processing
4 to 5 weeks turnaround time.
Last verified
April 2026
On this page 6
§ 01

Permit authority

Office of Planning and Building

Street address
1 Grove Street (basement of Town House), Peterborough, NH 03458
Coverage
Town of Peterborough; handles building permits, sign permits, subdivision and site plan review, variances, and special exceptions.
Online portal
Peterborough Office of Planning and Building
No dedicated online portal; contact department for current submission process
Additional resources
§ 02

When a permit is required

Permit triggers and exempt work for Peterborough

Building permits, sign permits; demolition, subdivision, site plan review, conditional use permits, variances. Contact department for complete list.

Note: Not specified on public pages. Contact Tim Herlihy at therlihy@peterboroughnh.gov or (603) 924-8000 ext. 118.

Required documents
  • Per project type; contact pmullen@peterboroughnh.gov for submittal requirements
Building code
NH State Building Code (RSA 155-A); 2021 suite effective December 31, 2024 per statewide HB 1681. Contact department to confirm current locally adopted edition.
Permit validity
Not specified on public pages; contact department.
Owner-builder
Not specified; contact Tim Herlihy at therlihy@peterboroughnh.gov or (603) 924-8000 ext. 118.
Contractor requirements
NH state licenses required for electrical, plumbing, and gas work.
§ 03

Application process

Typical processing: 4 to 5 weeks turnaround time.

  1. 01
    Contact Phillip Mullen at (603) 924-8000 ext. 104 or pmullen@peterboroughnh.gov for scheduling and submission.
  2. 02
    Prepare application and required plans.
  3. 03
    Submit application to Office of Planning and Building.
  4. 04
    Applications reviewed in order received; not reviewed until complete.
  5. 05
    Processing time: 4 to 5 weeks.
  6. 06
    Pay fees upon approval (see Chapter 202 Fee Schedule).
  7. 07
    Post permit on job site.
  8. 08
    Schedule inspections at least 24 hours in advance by calling (603) 924-8000.
  9. 09
    Inspection hours Mon-Thu 9 am - 5:30 pm.
  10. 10
    Final inspection and certificate.

Typical processing time: 4 to 5 weeks turnaround time.

Source: Office of Planning and Building ↗

§ 04

Fee schedule

Peterborough building permit fees

Fee type
Amount
01
Minimum permit fee
Not specified; contact department
02
Plan check fee
Included; see fee schedule
03
Permit fee formula
See Chapter 202 Fee Schedule; contact (603) 924-8000
04
Reinspection fee
Not specified; contact department

Contact department at (603) 924-8000 for payment methods

Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.

§ 05

Required inspections

Scheduling and sequence

How to schedule
  • (603) 924-8000 ext. 104 (Phillip Mullen, minimum 24-hour notice) (phone)
Scheduling deadline
Minimum 24-hour notice required.
Inspection hours
Monday-Thursday 9:00 am - 5:30 pm (open office hours 7-9 am; appointments recommended)

Typical sequence: Per project; contact Code Enforcement Officer Tim Herlihy.

Source: Office of Planning and Building ↗

§ 06

Frequently asked

Common questions about Peterborough permits

01 Do I need a building permit in Peterborough, NH?
Building permits, sign permits; demolition, subdivision, site plan review, conditional use permits, variances. Contact department for complete list.
02 How much does a building permit cost in Peterborough, NH?
Building permit fees in Peterborough, NH are set by the local building department and vary by project type and valuation. The minimum permit fee is Not specified; contact department. Fees are calculated as: See Chapter 202 Fee Schedule; contact (603) 924-8000. Plan check fee: Included; see fee schedule.
03 How do I apply for a building permit in Peterborough, NH?
To apply for a building permit in Peterborough, NH, follow these steps: 1. Contact Phillip Mullen at (603) 924-8000 ext. 104 or pmullen@peterboroughnh.gov for scheduling and submission. 2. Prepare application and required plans. 3. Submit application to Office of Planning and Building. 4. Applications reviewed in order received; not reviewed until complete. 5. Processing time: 4 to 5 weeks. 6. Pay fees upon approval (see Chapter 202 Fee Schedule). 7. Post permit on job site. 8. Schedule inspections at least 24 hours in advance by calling (603) 924-8000. 9. Inspection hours Mon-Thu 9 am - 5:30 pm. 10. Final inspection and certificate.
04 How long does it take to get a building permit in Peterborough, NH?
Building permit processing times in Peterborough, NH typically run 4 to 5 weeks turnaround time.. Timelines can vary based on project complexity and current department workload.
05 How do I schedule a building inspection in Peterborough, NH?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Peterborough, NH via: (603) 924-8000 ext. 104 (Phillip Mullen, minimum 24-hour notice). Minimum 24-hour notice required..
last verified April 2026 source Office of Planning and Building ↗ entry id permits/new-hampshire/hillsborough/peterborough

Educational reference. Permit rules and fees change — confirm current requirements directly with Office of Planning and Building before applying. Jaspector is not legal advice.