jaspector
City building permits

Town of Milford

How to apply for a building permit in Town of Milford, New Hampshire. Permit authority, application steps, fees, and inspection requirements.

Last verified
April 2026
On this page 6
§ 01

Permit authority

Community Development Department - Building Safety Division

Street address
1 Union Square, Milford, NH 03055
Coverage
Town of Milford; issues building, plumbing, electrical, and other permits; enforces zoning and site plan compliance.
Online portal
Milford PermitEyes Portal
PermitEyes
Additional resources
§ 02

When a permit is required

Permit triggers and exempt work for Milford

New construction, miscellaneous work, additions, alterations. Contact Building Inspector Jamie Ramsay for specifics.

Note: Contact Building Inspector at (603) 249-0620 or web@milford.nh.gov for exempt work list per adopted codes.

Required documents
  • Completed application
  • $50 application fee
  • Construction plans and supporting documents uploaded via PermitEyes
Building code
International Building Codes adopted by State of NH and Town of Milford (current suite per RSA 155-A).
Permit validity
Not specified on public pages; contact Building Safety Division.
Owner-builder
Not specified; contact (603) 249-0620.
Contractor requirements
NH state licenses required for electrical, plumbing, and gas work.
§ 03

Application process

Typical processing: Contact department at (603) 249-0620; $50 application fee required at submission for timely turnaround.

  1. 01
    Create account at https://permiteyes.us/milford/loginuser.php.
  2. 02
    Select permit type from the online system.
  3. 03
    Complete required fields and submit application.
  4. 04
    Process payment online (credit/debit or echeck).
  5. 05
    Upload supporting documentation through the portal.
  6. 06
    Building Inspector reviews plans for compliance with state and local codes.
  7. 07
    Permit issued; post on job site.
  8. 08
    Request inspections through portal at each required stage.
  9. 09
    Final inspection; Certificate of Occupancy or Certificate of Compliance issued.

Typical processing time: Contact department at (603) 249-0620; $50 application fee required at submission for timely turnaround.

Source: Community Development Department - Building Safety Division ↗

§ 04

Fee schedule

Milford building permit fees

Fee type
Amount
01
Minimum permit fee
$50 application fee (non-refundable, required at submission)
02
Plan check fee
Included; see fee schedule
03
Permit fee formula
Square-footage-based; $50 application fee plus additional fees per sq ft; see Schedule of Fees (contact department for current rates)
04
Reinspection fee
Not specified; contact Building Safety Division

Online via PermitEyes (credit/debit or echeck); in-person also accepted

Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.

§ 05

Required inspections

Scheduling and sequence

How to schedule
Inspection hours
Monday-Friday 8:00 am - 4:30 pm

Typical sequence: Per project type; contact Building Inspector.

Source: Community Development Department - Building Safety Division ↗

§ 06

Frequently asked

Common questions about Milford permits

01 Do I need a building permit in Milford, NH? ▸
New construction, miscellaneous work, additions, alterations. Contact Building Inspector Jamie Ramsay for specifics.
02 How much does a building permit cost in Milford, NH? ▸
Building permit fees in Milford, NH are set by the local building department and vary by project type and valuation. The minimum permit fee is $50 application fee (non-refundable, required at submission). Fees are calculated as: Square-footage-based; $50 application fee plus additional fees per sq ft; see Schedule of Fees (contact department for current rates). Plan check fee: Included; see fee schedule.
03 How do I apply for a building permit in Milford, NH? ▸
To apply for a building permit in Milford, NH, follow these steps: 1. Create account at https://permiteyes.us/milford/loginuser.php. 2. Select permit type from the online system. 3. Complete required fields and submit application. 4. Process payment online (credit/debit or echeck). 5. Upload supporting documentation through the portal. 6. Building Inspector reviews plans for compliance with state and local codes. 7. Permit issued; post on job site. 8. Request inspections through portal at each required stage. 9. Final inspection; Certificate of Occupancy or Certificate of Compliance issued.
04 How long does it take to get a building permit in Milford, NH? ▸
Building permit processing times in Milford, NH typically run Contact department at (603) 249-0620; $50 application fee required at submission for timely turnaround.. Timelines can vary based on project complexity and current department workload.
05 How do I schedule a building inspection in Milford, NH? ▸
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Milford, NH via: PermitEyes portal, (603) 249-0620.
last verified April 2026 source Community Development Department - Building Safety Division ↗ entry id permits/new-hampshire/hillsborough/milford

Educational reference. Permit rules and fees change — confirm current requirements directly with Community Development Department - Building Safety Division before applying. Jaspector is not legal advice.