jaspector
City building permits

Town of Milford

How to apply for a building permit in Town of Milford, New Hampshire. Permit authority, application steps, fees, and inspection requirements.

Last verified
April 2026
On this page 6
§ 01

Permit authority

Community Development Department - Building Safety Division

Street address
1 Union Square, Milford, NH 03055
Coverage
Town of Milford; issues building, plumbing, electrical, and other permits; enforces zoning and site plan compliance.
Online portal
Milford PermitEyes Portal
PermitEyes
Additional resources
§ 02

When a permit is required

Permit triggers and exempt work for Milford

New construction, miscellaneous work, additions, alterations. Contact Building Inspector Jamie Ramsay for specifics.

Note: Contact Building Inspector at (603) 249-0620 or web@milford.nh.gov for exempt work list per adopted codes.

Required documents
  • Completed application
  • $50 application fee
  • Construction plans and supporting documents uploaded via PermitEyes
Building code
International Building Codes adopted by State of NH and Town of Milford (current suite per RSA 155-A).
Permit validity
Not specified on public pages; contact Building Safety Division.
Owner-builder
Not specified; contact (603) 249-0620.
Contractor requirements
NH state licenses required for electrical, plumbing, and gas work.
§ 03

Application process

Typical processing: Contact department at (603) 249-0620; $50 application fee required at submission for timely turnaround.

  1. 01
    Create account at https://permiteyes.us/milford/loginuser.php.
  2. 02
    Select permit type from the online system.
  3. 03
    Complete required fields and submit application.
  4. 04
    Process payment online (credit/debit or echeck).
  5. 05
    Upload supporting documentation through the portal.
  6. 06
    Building Inspector reviews plans for compliance with state and local codes.
  7. 07
    Permit issued; post on job site.
  8. 08
    Request inspections through portal at each required stage.
  9. 09
    Final inspection; Certificate of Occupancy or Certificate of Compliance issued.

Typical processing time: Contact department at (603) 249-0620; $50 application fee required at submission for timely turnaround.

Source: Community Development Department - Building Safety Division ↗

§ 04

Fee schedule

Milford building permit fees

Fee type
Amount
01
Minimum permit fee
$50 application fee (non-refundable, required at submission)
02
Plan check fee
Included; see fee schedule
03
Permit fee formula
Square-footage-based; $50 application fee plus additional fees per sq ft; see Schedule of Fees (contact department for current rates)
04
Reinspection fee
Not specified; contact Building Safety Division

Online via PermitEyes (credit/debit or echeck); in-person also accepted

Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.

§ 05

Required inspections

Scheduling and sequence

How to schedule
Inspection hours
Monday-Friday 8:00 am - 4:30 pm

Typical sequence: Per project type; contact Building Inspector.

Source: Community Development Department - Building Safety Division ↗

§ 06

Frequently asked

Common questions about Milford permits

01 Do I need a building permit in Milford, NH?
New construction, miscellaneous work, additions, alterations. Contact Building Inspector Jamie Ramsay for specifics.
02 How much does a building permit cost in Milford, NH?
Building permit fees in Milford, NH are set by the local building department and vary by project type and valuation. The minimum permit fee is $50 application fee (non-refundable, required at submission). Fees are calculated as: Square-footage-based; $50 application fee plus additional fees per sq ft; see Schedule of Fees (contact department for current rates). Plan check fee: Included; see fee schedule.
03 How do I apply for a building permit in Milford, NH?
To apply for a building permit in Milford, NH, follow these steps: 1. Create account at https://permiteyes.us/milford/loginuser.php. 2. Select permit type from the online system. 3. Complete required fields and submit application. 4. Process payment online (credit/debit or echeck). 5. Upload supporting documentation through the portal. 6. Building Inspector reviews plans for compliance with state and local codes. 7. Permit issued; post on job site. 8. Request inspections through portal at each required stage. 9. Final inspection; Certificate of Occupancy or Certificate of Compliance issued.
04 How long does it take to get a building permit in Milford, NH?
Building permit processing times in Milford, NH typically run Contact department at (603) 249-0620; $50 application fee required at submission for timely turnaround.. Timelines can vary based on project complexity and current department workload.
05 How do I schedule a building inspection in Milford, NH?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Milford, NH via: PermitEyes portal, (603) 249-0620.
last verified April 2026 source Community Development Department - Building Safety Division ↗ entry id permits/new-hampshire/hillsborough/milford

Educational reference. Permit rules and fees change — confirm current requirements directly with Community Development Department - Building Safety Division before applying. Jaspector is not legal advice.