How to apply for a building permit in Town of Bennington, New Hampshire. Permit authority, application steps, fees, and inspection requirements.

Avg processing
Up to one month.
Last verified
April 2026
On this page 6
§ 01

Permit authority

Code Enforcement Office

Street address
7 School Street, Unit 101, Bennington, NH 03442
Coverage
Town of Bennington; John Kendall, Building Inspector/Code Enforcement Officer. Town office hours Mon-Thu 9 am - 4 pm.
Online portal
Bennington Permit Applications
Paper/PDF forms available online; no dedicated online portal
Additional resources
§ 02

When a permit is required

Permit triggers and exempt work for Bennington

Construction, enlargement, alteration, repair, relocation, demolition, occupancy changes; electrical, gas, mechanical, and plumbing system work.

Ordinary repairs do not require a permit or notification unless they involve: wall or partition removal, structural beam removal, egress changes, or modifications to utilities and mechanical systems.
  • Exempt Ordinary repairs do not require a permit or notification unless they involve: wall or partition removal, structural beam removal, egress changes, or modifications to utilities and mechanical systems.
Required documents
  • Completed building permit application
  • Energy audit for new construction or heated additions
  • Plot plans
  • Elevation drawings
Building code
NH State Building Code (RSA 155-A); contact department for current adopted edition.
Permit validity
Not specified; contact Code Enforcement Office.
Owner-builder
Not specified; contact John Kendall at (603) 562-6363.
Contractor requirements
NH state licenses required for electrical, plumbing, and gas work.

Source: Code Enforcement Office ↗

§ 03

Application process

Typical processing: Up to one month.

  1. 01
    Download permit application from https://townofbennington.com/permitapplications/ or pick up at Town Hall.
  2. 02
    Complete application and gather all supplemental documentation.
  3. 03
    Submit completed packet to Town Hall during Mon-Thu 9 am - 4 pm.
  4. 04
    Building Inspector reviews; process takes up to one month.
  5. 05
    Applicant receives Board of Selectmen approval notification.
  6. 06
    Pay fees upon permit pickup.
  7. 07
    Post permit on job site.
  8. 08
    Schedule inspections by contacting Building Inspector John Kendall at (603) 562-6363.
  9. 09
    Final inspection and certificate.

Typical processing time: Up to one month.

Source: Code Enforcement Office ↗

§ 04

Fee schedule

Bennington building permit fees

Fee type
Amount
01
Minimum permit fee
Not publicly available; fees due upon permit pickup
02
Plan check fee
Not specified; contact department
03
Permit fee formula
Not specified; contact John Kendall at (603) 562-6363 or town office at (603) 588-2189
04
Reinspection fee
Not specified; contact department

Fees due upon permit pickup at Town Hall

§ 05

Required inspections

Scheduling and sequence

How to schedule
  • (603) 562-6363 (John Kendall) (phone)
  • johnkendallgc@gmail.com (email)
Inspection hours
Contact inspector for available times

Typical sequence: Per project; contact Building Inspector.

Source: Code Enforcement Office ↗

§ 06

Frequently asked

Common questions about Bennington permits

01 Do I need a building permit in Bennington, NH?
Construction, enlargement, alteration, repair, relocation, demolition, occupancy changes; electrical, gas, mechanical, and plumbing system work.
02 How much does a building permit cost in Bennington, NH?
Building permit fees in Bennington, NH are set by the local building department and vary by project type and valuation. The minimum permit fee is Not publicly available; fees due upon permit pickup. Fees are calculated as: Not specified; contact John Kendall at (603) 562-6363 or town office at (603) 588-2189. Plan check fee: Not specified; contact department.
03 How do I apply for a building permit in Bennington, NH?
To apply for a building permit in Bennington, NH, follow these steps: 1. Download permit application from https://townofbennington.com/permitapplications/ or pick up at Town Hall. 2. Complete application and gather all supplemental documentation. 3. Submit completed packet to Town Hall during Mon-Thu 9 am - 4 pm. 4. Building Inspector reviews; process takes up to one month. 5. Applicant receives Board of Selectmen approval notification. 6. Pay fees upon permit pickup. 7. Post permit on job site. 8. Schedule inspections by contacting Building Inspector John Kendall at (603) 562-6363. 9. Final inspection and certificate.
04 How long does it take to get a building permit in Bennington, NH?
Building permit processing times in Bennington, NH typically run Up to one month.. Timelines can vary based on project complexity and current department workload.
05 What work is exempt from building permits in Bennington, NH?
Not all construction work requires a permit in Bennington, NH. The following work is generally exempt: Ordinary repairs do not require a permit or notification unless they involve: wall or partition removal, structural beam removal, egress changes, or modifications to utilities and mechanical systems.. When in doubt, confirm with the local building department before starting work.
06 How do I schedule a building inspection in Bennington, NH?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Bennington, NH via: (603) 562-6363 (John Kendall), johnkendallgc@gmail.com.
last verified April 2026 source Code Enforcement Office ↗ entry id permits/new-hampshire/hillsborough/bennington

Educational reference. Permit rules and fees change — confirm current requirements directly with Code Enforcement Office before applying. Jaspector is not legal advice.