How to apply for a building permit in Town of Francestown, New Hampshire. Permit authority, application steps, fees, and inspection requirements.

New Hampshire Hillsborough County Updated March 2026

Permit Authority

Town of Francestown; John Kendall, Building Inspector. Enforces NH State Building Code and local zoning.

Department
Building Inspector / Code Enforcement Office
Address
27 Main Street, Suite 2, Francestown, NH 03043
Phone
(603) 547-3469

Online Permit Portal

Platform: Paper/PDF forms; no dedicated online portal • Account required: No • Submission: In-person only

Application Process

  1. Download building permit application from town website or pick up at 27 Main Street, Suite 2.
  2. Prepare two complete sets of construction plans plus all required documentation.
  3. Submit application with plans and permit fee to Building Inspector.
  4. Applications reviewed in order received; not reviewed until complete.
  5. Applications checked for Building, Zoning, Site Plan, and Subdivision Code compliance.
  6. Pay required fees.
  7. Permit issued; post on job site.
  8. Schedule inspections with Building Inspector.
  9. Final inspection and certificate.

Typical processing time: Processed as quickly as possible; applicant notified if application is incomplete.

Source: Building Inspector / Code Enforcement Office

General Requirements

Per NH State Building Code (RSA 155-A) and local zoning ordinance. Contact Building Inspector for specific list.

Required Documents

  • Completed application
  • Two complete sets of construction plans
  • Site plan and other documentation per project type
Permit validity
Not specified; contact Building Inspector.
Building code
Current NH State Building Code (RSA 155-A) including IBC, IRC, IPC, IMC, IECC, NEC (NFPA 70), and Life Safety Code (NFPA 101).
Owner-builder
Not specified; contact buildinginspector@francestownnh.org.
Contractor requirements
NH state licenses required for electrical, plumbing, and gas work.

Fees

Minimum permit fee
Not publicly stated; see fee schedule or contact (603) 562-6363
Plan check fee
Included; see fee schedule
Permit fee formula
See fee schedule; contact Building Inspector for current rates
Reinspection fee
Not specified; contact department
Payment note
Submit with application; contact Building Inspector for payment methods

Fees change. Verify current amounts at the official fee schedule.

Work That Does NOT Require a Permit

Contact the Building Inspector / Code Enforcement Office to confirm whether your project requires a permit before starting work.

Inspections

How to Schedule

  • (603) 562-6363 (Building Inspector direct) (phone)
  • buildinginspector@francestownnh.org (email)
Inspection hours
Contact inspector for current availability

Typical inspection sequence: Per project; contact Building Inspector.

Additional Resources

Information on this page was last verified: March 2026. Permit rules and fees change — confirm current requirements directly with the Building Inspector / Code Enforcement Office before applying.

Frequently Asked Questions

Town of Francestown Building Permit FAQ

Do I need a building permit in Town of Francestown, NH?
Per NH State Building Code (RSA 155-A) and local zoning ordinance. Contact Building Inspector for specific list.
How much does a building permit cost in Town of Francestown, NH?
The minimum permit fee is Not publicly stated; see fee schedule or contact (603) 562-6363. Fees are calculated as: See fee schedule; contact Building Inspector for current rates. Plan check fee: Included; see fee schedule.
How do I apply for a building permit in Town of Francestown, NH?
1. Download building permit application from town website or pick up at 27 Main Street, Suite 2. 2. Prepare two complete sets of construction plans plus all required documentation. 3. Submit application with plans and permit fee to Building Inspector. 4. Applications reviewed in order received; not reviewed until complete. 5. Applications checked for Building, Zoning, Site Plan, and Subdivision Code compliance. 6. Pay required fees. 7. Permit issued; post on job site. 8. Schedule inspections with Building Inspector. 9. Final inspection and certificate.
How long does it take to get a building permit in Town of Francestown, NH?
Typical processing time is Processed as quickly as possible; applicant notified if application is incomplete..
How do I schedule a building inspection in Town of Francestown, NH?
Inspections can be scheduled via: (603) 562-6363 (Building Inspector direct), buildinginspector@francestownnh.org.

Need help with your project?

Navigating permits in Town of Francestown can be complicated.

Jaspector connects you with local experts who can review your scope, verify your contractor, and help you understand what permits your project actually needs.

Learn how Jaspector works
Important: This page is an educational resource provided by jaspector.com. It is not legal advice, and it does not substitute for official guidance from the permit authority listed above. Permit requirements, fees, and processes change frequently. Always verify current requirements directly with the issuing department before beginning any construction project. Use of this page does not create an attorney-client relationship. Jaspector assumes no liability for any outcomes arising from reliance on this information.

Other cities in Hillsborough County

View all Hillsborough County jurisdictions →