When a permit is required
Permit triggers and exempt work for North Salt Lake
North Salt Lake requires permits for all new construction, additions, basement finishes, remodeling, siding, reroofs, window replacement, and water heater and furnace replacements.
- Exempt Accessory structures under 200 square feet do not require a building permit but do require a no-fee land use permit.
- Exempt Some demolition-related work still requires asbestos documentation even where demolition is otherwise authorized.
Note: City-specific full exemption list not fully posted; verify before starting work.
- CityInspect application materials
- Additional geologic hazard investigation may be required in the Sensitive Lands Overlay Zone
- Building code
- Fee page says permit fees use the most updated ICC valuation data; statewide 2021 Utah code adoption applies. City also posts local design and permit guidance.
- Permit validity
- Not clearly posted on the public pages.
- Owner-builder
- Not clearly summarized in the public pages.
- Contractor requirements
- Utah DOPL contractor licensing applies for licensable work.
Application process
Typical processing: Permits not requiring plan review are normally issued by the next business day after fees are paid.
- 01 Submit the permit application through CityInspect.
- 02 Attach all documents required by the permit system; the city notes full documentation speeds turnaround.
- 03 If plan review is required, North Salt Lake sends department comments and approvals by email.
- 04 Sensitive Lands permits may require geologic hazard review, fees, bond, scoping meeting, geotech report, and engineering review before building permit issuance.
- 05 Once all departments approve, the city calculates fees and sends payment instructions.
- 06 Pay through the portal, by phone, or in person; permit is then issued and inspections can be scheduled.
Typical processing time: Permits not requiring plan review are normally issued by the next business day after fees are paid.
Source: Building Department ↗
Fee schedule
North Salt Lake building permit fees
Fees may be paid through the portal, by calling the building department, or in person; 2% service fee on credit card transactions.
Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.
Required inspections
Scheduling and sequence
- Inspection hours
- Monday through Thursday only; AM 8:00 to 12:00 or PM 1:00 to 4:00; no same-day inspections.
Typical sequence: Varies by permit and is listed in the portal permit record; call with questions.
Frequently asked
Common questions about North Salt Lake permits
01 Do I need a building permit in North Salt Lake, UT? ▸
02 How much does a building permit cost in North Salt Lake, UT? ▸
03 How do I apply for a building permit in North Salt Lake, UT? ▸
04 How long does it take to get a building permit in North Salt Lake, UT? ▸
05 What work is exempt from building permits in North Salt Lake, UT? ▸
06 How do I schedule a building inspection in North Salt Lake, UT? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Building Department before applying. Jaspector is not legal advice.