On this page 6
When a permit is required
Permit triggers and exempt work for Fruit Heights
Fruit Heights lists building permit requirements for new homes, demolition, accessory structures over 200 square feet, remodels, pools, gas meter upgrades, additions, roof work, landscaping, retaining walls over 4 feet, commercial buildings, mechanical, fences, electrical, and plumbing.
- Exempt One-story detached accessory structures used as tool and storage sheds, playhouses, and similar uses, provided the floor area does not exceed 120 square feet.
- Exempt Fences not over 6 feet high.
- Exempt Retaining walls not over 4 feet in height measured from the bottom of the footing to the top of the wall, unless supporting a surcharge.
Note: Additional state-code exemptions may apply; confirm with city staff.
- Application plus project-specific packet materials
- New single-family packet and inspection checklists are posted
- Building code
- Fruit Heights public pages appear inconsistent. The permit page still shows older 2018 and 2015 code references, while newer packet materials reference adopted codes effective July 1, 2021. Verify current local amendments directly with the city.
- Permit validity
- Not clearly posted on the public page.
- Owner-builder
- Not clearly summarized on the public page.
- Contractor requirements
- Utah DOPL contractor licensing applies.
Application process
Typical processing: Not clearly posted on the public page.
- 01 Use the online building permit application for the applicable project type.
- 02 For new single-family dwellings, use the posted packet and checklist materials.
- 03 If soil will be disturbed, obtain the separate Storm Water Construction Activity Permit.
- 04 Submit plans and materials for city review.
- 05 Pay permit fees under the building permit fee schedule.
- 06 Schedule inspections by phone and complete final inspection to close out and release bonds.
Typical processing time: Not clearly posted on the public page.
Source: Building Department ↗
Fee schedule
Effective January 2025
Verify current payment timing and method with city staff during permit issuance.
Fees change periodically. Confirm at the official fee schedule ↗ (effective January 2025) before budgeting.
Required inspections
Scheduling and sequence
- 801-546-0861 ext. 2 (phone)
Typical sequence: Final inspection checklists are posted for new construction and for basement, addition, or remodel projects.
Frequently asked
Common questions about Fruit Heights permits
01 Do I need a building permit in Fruit Heights, UT? ▸
02 How much does a building permit cost in Fruit Heights, UT? ▸
03 How do I apply for a building permit in Fruit Heights, UT? ▸
04 How long does it take to get a building permit in Fruit Heights, UT? ▸
05 What work is exempt from building permits in Fruit Heights, UT? ▸
06 How do I schedule a building inspection in Fruit Heights, UT? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Building Department before applying. Jaspector is not legal advice.