jaspector
§ UT Davis County
City building permits

City of Fruit Heights

How to apply for a building permit in City of Fruit Heights, Utah. Permit authority, application steps, fees, and inspection requirements.

Avg processing
Not clearly posted on the public page.
Last verified
April 2026
On this page 6
§ 01

Permit authority

Building Department

Street address
910 S Mountain Road, Fruit Heights, UT 84037
Coverage
Covers properties inside Fruit Heights City limits.
Online portal
CivicReview
CivicReview
§ 02

When a permit is required

Permit triggers and exempt work for Fruit Heights

Fruit Heights lists building permit requirements for new homes, demolition, accessory structures over 200 square feet, remodels, pools, gas meter upgrades, additions, roof work, landscaping, retaining walls over 4 feet, commercial buildings, mechanical, fences, electrical, and plumbing.

One-story detached accessory structures used as tool and storage sheds, playhouses, and similar uses, provided the floor area does not exceed 120 square feet.
Fences not over 6 feet high.
Retaining walls not over 4 feet in height measured from the bottom of the footing to the top of the wall, unless supporting a surcharge.
  • Exempt One-story detached accessory structures used as tool and storage sheds, playhouses, and similar uses, provided the floor area does not exceed 120 square feet.
  • Exempt Fences not over 6 feet high.
  • Exempt Retaining walls not over 4 feet in height measured from the bottom of the footing to the top of the wall, unless supporting a surcharge.

Note: Additional state-code exemptions may apply; confirm with city staff.

Required documents
  • Application plus project-specific packet materials
  • New single-family packet and inspection checklists are posted
Building code
Fruit Heights public pages appear inconsistent. The permit page still shows older 2018 and 2015 code references, while newer packet materials reference adopted codes effective July 1, 2021. Verify current local amendments directly with the city.
Permit validity
Not clearly posted on the public page.
Owner-builder
Not clearly summarized on the public page.
Contractor requirements
Utah DOPL contractor licensing applies.
§ 03

Application process

Typical processing: Not clearly posted on the public page.

  1. 01
    Use the online building permit application for the applicable project type.
  2. 02
    For new single-family dwellings, use the posted packet and checklist materials.
  3. 03
    If soil will be disturbed, obtain the separate Storm Water Construction Activity Permit.
  4. 04
    Submit plans and materials for city review.
  5. 05
    Pay permit fees under the building permit fee schedule.
  6. 06
    Schedule inspections by phone and complete final inspection to close out and release bonds.

Typical processing time: Not clearly posted on the public page.

Source: Building Department ↗

§ 04

Fee schedule

Effective January 2025

Fee type
Amount
01
Plan check fee
Residential and pools 40% of building permit fee; commercial and pools 65% of building permit fee.
02
Permit fee formula
Building permit costs vary by square footage of the home and impact fees; fee schedule also lists application and inspection items.
03
Reinspection fee
Scheduled inspection not ready, no show, or no call fee is $200.

Verify current payment timing and method with city staff during permit issuance.

Fees change periodically. Confirm at the official fee schedule ↗ (effective January 2025) before budgeting.

§ 05

Required inspections

Scheduling and sequence

How to schedule
  • 801-546-0861 ext. 2 (phone)

Typical sequence: Final inspection checklists are posted for new construction and for basement, addition, or remodel projects.

§ 06

Frequently asked

Common questions about Fruit Heights permits

01 Do I need a building permit in Fruit Heights, UT?
Fruit Heights lists building permit requirements for new homes, demolition, accessory structures over 200 square feet, remodels, pools, gas meter upgrades, additions, roof work, landscaping, retaining walls over 4 feet, commercial buildings, mechanical, fences, electrical, and plumbing.
02 How much does a building permit cost in Fruit Heights, UT?
Building permit fees in Fruit Heights, UT are set by the local building department and vary by project type and valuation. Fees are calculated as: Building permit costs vary by square footage of the home and impact fees; fee schedule also lists application and inspection items.. Plan check fee: Residential and pools 40% of building permit fee; commercial and pools 65% of building permit fee..
03 How do I apply for a building permit in Fruit Heights, UT?
To apply for a building permit in Fruit Heights, UT, follow these steps: 1. Use the online building permit application for the applicable project type. 2. For new single-family dwellings, use the posted packet and checklist materials. 3. If soil will be disturbed, obtain the separate Storm Water Construction Activity Permit. 4. Submit plans and materials for city review. 5. Pay permit fees under the building permit fee schedule. 6. Schedule inspections by phone and complete final inspection to close out and release bonds.
04 How long does it take to get a building permit in Fruit Heights, UT?
Building permit processing times in Fruit Heights, UT typically run Not clearly posted on the public page.. Timelines can vary based on project complexity and current department workload.
05 What work is exempt from building permits in Fruit Heights, UT?
Not all construction work requires a permit in Fruit Heights, UT. The following work is generally exempt: One-story detached accessory structures used as tool and storage sheds, playhouses, and similar uses, provided the floor area does not exceed 120 square feet.; Fences not over 6 feet high.; Retaining walls not over 4 feet in height measured from the bottom of the footing to the top of the wall, unless supporting a surcharge.. Note: Additional state-code exemptions may apply; confirm with city staff. When in doubt, confirm with the local building department before starting work.
06 How do I schedule a building inspection in Fruit Heights, UT?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Fruit Heights, UT via: 801-546-0861 ext. 2.
last verified April 2026 source Building Department ↗ entry id permits/utah/davis/fruit-heights

Educational reference. Permit rules and fees change — confirm current requirements directly with Building Department before applying. Jaspector is not legal advice.