When a permit is required
Permit triggers and exempt work for Kaysville
Kaysville requires permits for new construction, remodels, repairs, additions, and regulated electrical, plumbing, mechanical, and fire sprinkler or alarm work.
- Exempt Flat cement work outside city right-of-way does not require a building permit.
- Exempt Accessory buildings under 200 square feet do not require a permit, but must meet zoning requirements.
Note: Other exemptions are not fully restated on the main page; confirm with the Building Department.
- Project-specific checklists for accessory buildings, basement finishes, decks, demolition, electrical service upgrades, pools and spas, remodels, single and multiple family dwellings, and solar
- Building code
- Kaysville public materials cite 2021 IRC or 2021 IBC; statewide 2021 Utah codes apply unless local amendments are adopted.
- Permit validity
- Permits expire if work does not commence within 180 days of approval or issuance, or if work is suspended or abandoned for 180 days after commencement.
- Owner-builder
- City posts owner-builder and handyman information; owner-builder filing applies when the property owner acts in place of a contractor.
- Contractor requirements
- Utah DOPL contractor licensing applies.
Application process
Typical processing: Most permits take approximately 2 weeks for review.
- 01 Create a City Inspect account and submit plans through the online building permit portal.
- 02 Upload the applicable checklist and project documents for the permit type.
- 03 City reviews applications in received order.
- 04 Pay the non-refundable application deposit up front.
- 05 After approval, pay the remaining balance at permit issuance and print the issued permit from the portal.
- 06 Schedule inspections by calling the Building Department with at least 24 hours notice.
Typical processing time: Most permits take approximately 2 weeks for review.
Source: Building Department ↗
Fee schedule
Kaysville building permit fees
Application deposits are due up front; remaining fees are paid at permit issuance.
Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.
Required inspections
Scheduling and sequence
- 801-544-1363 (phone)
- Scheduling deadline
- At least 24 hours notice required.
- Inspection hours
- Monday through Thursday 8:30 a.m. to 5:00 p.m.; Friday 8:30 a.m. to 1:00 p.m.; no same-day inspections.
Typical sequence: Water and sewer laterals, temporary power, footings, foundation, underground plumbing, 4-way, flashing, gas line, insulation, permanent power, shower pan, final site inspection, and final.
Frequently asked
Common questions about Kaysville permits
01 Do I need a building permit in Kaysville, UT? ▸
02 How much does a building permit cost in Kaysville, UT? ▸
03 How do I apply for a building permit in Kaysville, UT? ▸
04 How long does it take to get a building permit in Kaysville, UT? ▸
05 What work is exempt from building permits in Kaysville, UT? ▸
06 How do I schedule a building inspection in Kaysville, UT? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Building Department before applying. Jaspector is not legal advice.