On this page 6
When a permit is required
Permit triggers and exempt work for Ridgewood
Building permits are required for new construction, additions, alterations, renovations, electrical, plumbing, fire protection work, HVAC installation, fences, decks, pools, sheds, signs, demolition, and change of use.
- Exempt Painting
- Exempt Window/door replacement (same size)
- Exempt Roof/siding repair (residential)
- Exempt Flooring
- Exempt Cabinetry
- Exempt Non-structural repairs
Note: Exempt from building permit does not mean exempt from zoning requirements. Approved plans must be kept on job site at all times; inspection will not be conducted if plans are not available.
- UCC F100 and F170 forms
- Subcode technical sections
- Plans by NJ-licensed architect/engineer (as required)
- Property survey
- Zoning approval (if applicable)
- Building code
- New Jersey Uniform Construction Code (NJAC 5:23), based on IBC with NJ amendments
- Permit validity
- 12 months from last inspection
- Owner-builder
- Homeowners may act as owner-builders for their own primary residence.
- Contractor requirements
- All contractors must be registered with NJ Division of Consumer Affairs. Verify at: https://www.njconsumeraffairs.gov/
Source: Building Department ↗
Application process
Typical processing: Contact department for timelines
- 01 Contact Building Department at (201) 670-5500 Ext. 5506 for information.
- 02 Submit permit application via SDL portal or in-person (forms available at department).
- 03 Provide required documentation.
- 04 Plan review (if required).
- 05 Pay fees.
- 06 Receive permit.
- 07 Schedule inspections.
Typical processing time: Contact department for timelines
Source: Building Department ↗
Fee schedule
Effective Chapter 145 of Village Code
Certificate of Occupancy: Residential $100, Commercial $150, CCO $100, CO Change in Use $150. State Training Surcharge: Applicable
Fees change periodically. Confirm at the official fee schedule ↗ (effective Chapter 145 of Village Code) before budgeting.
Required inspections
Scheduling and sequence
- SDL Portal (online)
- (201) 670-5500 Ext. 5506 (phone)
- Scheduling deadline
- Call at least 24 hours in advance; do not leave inspection requests on voicemail. Provide: permit number, inspection type, address, callback number.
- Inspection hours
- Building Inspections: Daily, 9 AM - 3 PM. Electric Inspections: Daily, 9 AM - 3 PM. Plumbing Inspections: Daily, 8:30 AM - 4:30 PM. Fire Inspections: Call (201) 670-5500 Ext. 5480
Typical sequence: Required sequence: footing, foundation (prior to backfill), utility services/septic, rough plumbing, rough wiring, framing (after rough electrical/plumbing approvals), sheathing, insulation (prior to covering), slab, final plumbing, final wiring, fire alarm/sprinkler systems.
Source: Building Department ↗
Frequently asked
Common questions about Ridgewood permits
01 Do I need a building permit in Ridgewood, NJ? ▸
02 How much does a building permit cost in Ridgewood, NJ? ▸
03 How do I apply for a building permit in Ridgewood, NJ? ▸
04 How long does it take to get a building permit in Ridgewood, NJ? ▸
05 What work is exempt from building permits in Ridgewood, NJ? ▸
06 How do I schedule a building inspection in Ridgewood, NJ? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Building Department before applying. Jaspector is not legal advice.