§ 01

Permit authority

Fort Lee Building Department

Street address
1365 Inwood Terrace, Fort Lee, NJ 07024
Coverage
All properties within the Borough of Fort Lee.
Additional resources
§ 02

When a permit is required

Permit triggers and exempt work for Fort Lee

Building permits are required for new construction, additions, alterations, renovations, electrical, plumbing, HVAC work, fences, decks, pools, sheds, demolition, signs, and change of use/occupancy.

Painting, interior finishes
Window/door replacement (same size)
Roof/siding repair on residential
Flooring replacement
Cabinetry
Non-structural repairs
  • Exempt Painting, interior finishes
  • Exempt Window/door replacement (same size)
  • Exempt Roof/siding repair on residential
  • Exempt Flooring replacement
  • Exempt Cabinetry
  • Exempt Non-structural repairs

Note: Exempt from building permit does not mean exempt from zoning requirements. Verify edge cases with Building Department.

Required documents
  • UCC F100 Construction Permit Application
  • UCC F170 Construction Permit
  • Applicable subcode technical sections
  • Plans sealed by NJ-licensed architect/engineer (commercial/structural)
  • Property survey (for exterior/site work)
  • Contractor license information
Building code
New Jersey Uniform Construction Code (NJAC 5:23), based on IBC with NJ amendments
Permit validity
12 months from last inspection (NJ UCC standard)
Owner-builder
Homeowners may act as owner-builders for their own primary residence.
Contractor requirements
All contractors must be registered with NJ Division of Consumer Affairs. Verify at: https://www.njconsumeraffairs.gov/

Source: Fort Lee Building Department ↗

§ 03

Application process

Typical processing: Contact department for current timelines

  1. 01
    Contact Construction Official Brian Ribarro at (201) 592-3500 x1025 to discuss project requirements.
  2. 02
    Determine if zoning approval is required.
  3. 03
    Submit complete UCC permit application package.
  4. 04
    Submit required plans and documentation.
  5. 05
    Pay applicable fees.
  6. 06
    Permit issued after review approval.
  7. 07
    Schedule inspections as work progresses.

Typical processing time: Contact department for current timelines

Source: Fort Lee Building Department ↗

§ 04

Fee schedule

Fort Lee building permit fees

Fee type
Amount
01
Plan check fee
Percentage of permit fee (typical)
02
Permit fee formula
Contact Building Department at (201) 592-3500 x1503 for current fee schedule. Typical NJ UCC structure: New construction per cubic foot; alterations per $1,000 of estimated cost.

State training surcharge applies

§ 05

Required inspections

Scheduling and sequence

How to schedule
  • (201) 592-3500 x1503 (phone)
Scheduling deadline
Provide permit number and inspection type
Inspection hours
Monday-Friday, 8:30 AM to 4:00 PM

Typical sequence: Required inspections: footing and foundation, rough electrical, plumbing, framing, insulation, final inspections (all subcodes).

Source: Fort Lee Building Department ↗

§ 06

Frequently asked

Common questions about Fort Lee permits

01 Do I need a building permit in Fort Lee, NJ?
Building permits are required for new construction, additions, alterations, renovations, electrical, plumbing, HVAC work, fences, decks, pools, sheds, demolition, signs, and change of use/occupancy.
02 How much does a building permit cost in Fort Lee, NJ?
Building permit fees in Fort Lee, NJ are set by the local building department and vary by project type and valuation. Fees are calculated as: Contact Building Department at (201) 592-3500 x1503 for current fee schedule. Typical NJ UCC structure: New construction per cubic foot; alterations per $1,000 of estimated cost.. Plan check fee: Percentage of permit fee (typical).
03 How do I apply for a building permit in Fort Lee, NJ?
To apply for a building permit in Fort Lee, NJ, follow these steps: 1. Contact Construction Official Brian Ribarro at (201) 592-3500 x1025 to discuss project requirements. 2. Determine if zoning approval is required. 3. Submit complete UCC permit application package. 4. Submit required plans and documentation. 5. Pay applicable fees. 6. Permit issued after review approval. 7. Schedule inspections as work progresses.
04 How long does it take to get a building permit in Fort Lee, NJ?
Building permit processing times in Fort Lee, NJ typically run Contact department for current timelines. Timelines can vary based on project complexity and current department workload.
05 What work is exempt from building permits in Fort Lee, NJ?
Not all construction work requires a permit in Fort Lee, NJ. The following work is generally exempt: Painting, interior finishes; Window/door replacement (same size); Roof/siding repair on residential; Flooring replacement; Cabinetry; Non-structural repairs. Note: Exempt from building permit does not mean exempt from zoning requirements. Verify edge cases with Building Department. When in doubt, confirm with the local building department before starting work.
06 How do I schedule a building inspection in Fort Lee, NJ?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Fort Lee, NJ via: (201) 592-3500 x1503. Provide permit number and inspection type.
last verified April 2026 source Fort Lee Building Department ↗ entry id permits/new-jersey/bergen/fort-lee

Educational reference. Permit rules and fees change — confirm current requirements directly with Fort Lee Building Department before applying. Jaspector is not legal advice.

§   Adjacent

Other jurisdictions in Bergen County.

Same county, different permit office. Click for that jurisdiction's full guide.

All Bergen County jurisdictions →