When a permit is required
Permit triggers and exempt work for Paramus
Building permits are required for new construction, additions, renovations, alterations, electrical, plumbing, fire protection work, HVAC installation, site work (patios, walkways, driveways, generators, AC condensers, pool equipment), fences, sheds, decks, pools, signs, and demolition.
- Exempt Ordinary repairs
- Exempt Painting
- Exempt Window/door replacement (same size)
- Exempt Roof/siding repair (residential)
- Exempt Flooring
- Exempt Cabinetry
Note: Work without permit may be subject to zoning approval requirements, variances, penalties up to $2,000 per violation, and insurance claim denial.
- UCC F170 Construction Permit (for each application)
- UCC F100 Construction Permit Application
- UCC F110 Building Subcode Technical Section
- UCC F120 Electrical Subcode Technical Section
- UCC F130 Plumbing Subcode Technical Section
- UCC F140 Fire Protection Subcode Technical Section
- UCC F145 Mechanical Inspector Technical Section
- UCC F370 Chimney Verification (for fuel-fired equipment replacement)
- UCC F390 Framing Checklist (for new construction/additions)
- Survey (not older than 20 years for site work)
- Plans sealed by NJ-licensed architect/engineer (commercial)
- Homeowner-signed plans (for owner-occupied single-family)
- Building code
- New Jersey Uniform Construction Code (NJAC 5:23), based on IBC with NJ amendments
- Permit validity
- 12 months from last inspection
- Owner-builder
- Homeowners may act as owner-builders for their own primary residence.
- Contractor requirements
- All contractors must be registered with NJ Division of Consumer Affairs. Licensed electrician must sign electrical applications (unless homeowner in owner-occupied single-family). Licensed plumber must sign plumbing applications (unless homeowner in owner-occupied single-family). Verify at: https://www.njconsumeraffairs.gov/
Application process
Typical processing: Contact department for timelines
- 01 Contact Building Department at (201) 265-2100 Ext. 2230 with questions.
- 02 Submit permit application (UCC forms available on website) via SDL portal or in-person.
- 03 Provide required subcode technical sections.
- 04 Include plans, specifications, survey.
- 05 Pay fees (permit and zoning review if applicable).
- 06 Receive permit after review.
- 07 Schedule inspections via SDL portal or phone.
Typical processing time: Contact department for timelines
Fee schedule
Effective Borough Ordinance Chapter 203, Article III
Certificate of Occupancy: Included/Additional fees may apply. Zoning Review: Additional fee applies. State Training Surcharge: Per NJAC 5:23-4.19
Fees change periodically. Confirm at the official fee schedule ↗ (effective Borough Ordinance Chapter 203, Article III) before budgeting.
Required inspections
Scheduling and sequence
- SDL Portal (online)
- (201) 265-2100 Ext. 2230 (phone)
- Scheduling deadline
- Contact department for scheduling requirements
- Inspection hours
- Monday - Friday, 8:30 AM to 3:00 PM
Typical sequence: Required inspections: footing, foundation (prior to backfill), rough electrical, plumbing, framing, insulation (prior to covering), final inspections (all subcodes). All open permits must be closed one week prior to scheduling resale inspection.
Frequently asked
Common questions about Paramus permits
01 Do I need a building permit in Paramus, NJ? ▸
02 How much does a building permit cost in Paramus, NJ? ▸
03 How do I apply for a building permit in Paramus, NJ? ▸
04 How long does it take to get a building permit in Paramus, NJ? ▸
05 What work is exempt from building permits in Paramus, NJ? ▸
06 How do I schedule a building inspection in Paramus, NJ? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Paramus Borough Building Department before applying. Jaspector is not legal advice.