How to apply for a building permit in City of Stuart, Florida. Permit authority, application steps, fees, and inspection requirements.

Min. permit fee
$106
Last verified
April 2026
On this page 6
§ 01

Permit authority

City of Stuart Building Division

Street address
121 SW Flagler Avenue, Stuart, FL 34994
Coverage
Stuart runs its own city building division for projects inside city limits.
Online portal
OpenGov Portal
OpenGov
§ 02

When a permit is required

Permit triggers and exempt work for Stuart

Stuart's Building Division receives permit applications for structures ranging from office buildings to homes to fences and reviews plans for compliance with the Florida Building Code and city ordinances.

Nonresidential farm buildings on farms
Certain temporary construction sheds
Surfacing of floors or slabs with carpet, tile, brick, wood, or other finish materials
Residential playground equipment without electrical service
  • Exempt Nonresidential farm buildings on farms
  • Exempt Certain temporary construction sheds
  • Exempt Surfacing of floors or slabs with carpet, tile, brick, wood, or other finish materials
  • Exempt Residential playground equipment without electrical service

Note: These are Florida Building Code exemptions only. Other state and county departments or agencies may still require approvals or permits.

Required documents
  • Permit application
  • Plans
  • Contractor licensing and insurance documents
  • Trade subcontractor information
Building code
2023 Florida Building Code, 8th Edition, effective December 31, 2023
Owner-builder
Owner-builders may apply only for their own use and occupancy and may not hire unlicensed contractors.
Contractor requirements
Effective July 1, 2025, Stuart requires state registration or state certification where Florida law so provides. Certificates of Competency are no longer accepted.

Source: City of Stuart Building Division ↗

§ 03

Application process

Application → plan check → issuance → inspection → final

  1. 01
    Confirm the property is inside Stuart city limits.
  2. 02
    Create or use an OpenGov account and select the Building and Permitting workflow.
  3. 03
    Submit the permit application and required plans/documents through OpenGov.
  4. 04
    If applicable, complete contractor registration and provide the required licensing and insurance documentation.
  5. 05
    Respond to plan review comments and pay fees before permit issuance.
  6. 06
    Obtain the permit before starting work, except in limited emergency-permit scenarios.
  7. 07
    Schedule inspections and obtain final approval.

Source: City of Stuart Building Division ↗

§ 04

Fee schedule

Stuart building permit fees

Fee type
Amount
01
Minimum permit fee
$106
02
Permit fee formula
$0-$50,000: greater of $106 or $22 for first $1,000 plus $6 per additional $1,000; $50,001-$100,000: $342 plus $7 per $1,000 above $50,000; $100,001-$500,000: $585 for first $100,000 plus $6 per additional $1,000; $500,001+: $2,796 plus $3 per $1,000 above $500,000

Stuart separately publishes city impact fees for qualifying new development. Examples include single-family detached total city impact fees of $2,143.43 per unit and commercial total city impact fees of $2,190.81 per 1,000 square feet of floor area.

Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.

§ 05

Required inspections

Scheduling and sequence

How to schedule
  • 772-600-1212 (phone)

Source: City of Stuart Building Division ↗

§ 06

Frequently asked

Common questions about Stuart permits

01 Do I need a building permit in Stuart, FL?
Stuart's Building Division receives permit applications for structures ranging from office buildings to homes to fences and reviews plans for compliance with the Florida Building Code and city ordinances.
02 How much does a building permit cost in Stuart, FL?
Building permit fees in Stuart, FL are set by the local building department and vary by project type and valuation. The minimum permit fee is $106. Fees are calculated as: $0-$50,000: greater of $106 or $22 for first $1,000 plus $6 per additional $1,000; $50,001-$100,000: $342 plus $7 per $1,000 above $50,000; $100,001-$500,000: $585 for first $100,000 plus $6 per additional $1,000; $500,001+: $2,796 plus $3 per $1,000 above $500,000.
03 How do I apply for a building permit in Stuart, FL?
To apply for a building permit in Stuart, FL, follow these steps: 1. Confirm the property is inside Stuart city limits. 2. Create or use an OpenGov account and select the Building and Permitting workflow. 3. Submit the permit application and required plans/documents through OpenGov. 4. If applicable, complete contractor registration and provide the required licensing and insurance documentation. 5. Respond to plan review comments and pay fees before permit issuance. 6. Obtain the permit before starting work, except in limited emergency-permit scenarios. 7. Schedule inspections and obtain final approval.
04 What work is exempt from building permits in Stuart, FL?
Not all construction work requires a permit in Stuart, FL. The following work is generally exempt: Nonresidential farm buildings on farms; Certain temporary construction sheds; Surfacing of floors or slabs with carpet, tile, brick, wood, or other finish materials; Residential playground equipment without electrical service. Note: These are Florida Building Code exemptions only. Other state and county departments or agencies may still require approvals or permits. When in doubt, confirm with the local building department before starting work.
05 How do I schedule a building inspection in Stuart, FL?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Stuart, FL via: 772-600-1212.
last verified April 2026 source City of Stuart Building Division ↗ entry id permits/florida/martin/stuart

Educational reference. Permit rules and fees change — confirm current requirements directly with City of Stuart Building Division before applying. Jaspector is not legal advice.