City Building Permits
Deerfield Beach, FL - 2026 Building Permit Guide
How to apply for a building permit in Deerfield Beach, Florida. Permit authority, application steps, fees, and inspection requirements.
Quick Start
Search active and historical permits through City of Deerfield Beach's permit portal.
Apply online through the permit portal; an account is required. Start by submit permit application through CAP Government digital permitting system.
Call: 954-250-4060
Submit through CAP portal. Hours: Monday-Friday, standard business hours. Reinspection fee: Applied if required.
Projects that usually need a permit
- New construction, additions, and major alterations or repairs
- New construction, additions, and structural alterations
- Reroofing, window and door replacements, and exterior upgrades
- HVAC, electrical, plumbing, and gas work
Important: Deerfield Beach uses CAP Government, Inc. as a contracted building-services provider.
Permit Authority
All properties within the incorporated City of Deerfield Beach.
- Department
- Building Services
- Address
- 150 NE 2 Avenue, Deerfield Beach, FL 33441
- Phone
- 954-250-4060
Online Permit Portal
Platform: CAP Government • Account required: Yes • Submission: Online only
Application Process
- Submit permit application through CAP Government digital permitting system.
- Attach construction plans and site documentation.
- CAP Government conducts plan review and approvals per Florida Building Code.
- Respond to any correction comments.
- Pay permit fees.
- Schedule inspections through CAP system.
- Obtain final approval and permit close-out.
Typical processing time: Varies; check with city
Source: Building Services
General Requirements
A building permit is required for construction and alterations in Deerfield Beach.
Required Documents
- CAP Government permit application
- Construction plans and site plans
- Structural calculations (if required)
- Professional design certification (if required)
- Permit validity
- Check city code for expiration rules
- Building code
- Florida Building Code (FBC); Broward County Administrative Provisions
- Owner-builder
- Owner-builders must comply with city requirements
- Contractor requirements
- Contractors must hold valid Florida construction licenses.
Fees
- Minimum permit fee
- Variable
- Plan check fee
- Percentage of building permit fee
- Permit fee formula
- Based on construction valuation
- Reinspection fee
- Applied if required
- Payment note
- Payment through CAP Government system or city cashier
Fees change. Verify current amounts at the official fee schedule (effective Check city website for current schedule).
Work That Does NOT Require a Permit
Contact the Building Services to confirm whether your project requires a permit before starting work.
Inspections
How to Schedule
- CAP Government portal (online)
- Scheduling deadline
- Submit through CAP portal
- Inspection hours
- Monday-Friday, standard business hours
- Time windows
- Confirm with city
Typical inspection sequence: CAP Government provides digital plan review and inspections
Confirm with city if available
Additional Resources
- Building code: Florida Building Code (FBC); Broward County Administrative Provisions
- Verify contractor license: Florida Construction License Verification
- License lookup guide: Florida Contractor License Requirements
- Contract template: Florida Homeowner-Contractor Agreement
- Florida hub: Florida Contractor License & Permit Hub
Information on this page was last verified: 2026-04. Permit rules and fees change — confirm current requirements directly with the Building Services before applying.
Frequently Asked Questions
Deerfield Beach Building Permit FAQ
- Do I need a building permit in Deerfield Beach, FL?
- A building permit is required for construction and alterations in Deerfield Beach.
- How much does a building permit cost in Deerfield Beach, FL?
- Building permit fees in Deerfield Beach, FL are set by the local building department and vary by project type and valuation. The minimum permit fee is Variable. Fees are calculated as: Based on construction valuation. Plan check fee: Percentage of building permit fee.
- How do I apply for a building permit in Deerfield Beach, FL?
- To apply for a building permit in Deerfield Beach, FL, follow these steps: 1. Submit permit application through CAP Government digital permitting system. 2. Attach construction plans and site documentation. 3. CAP Government conducts plan review and approvals per Florida Building Code. 4. Respond to any correction comments. 5. Pay permit fees. 6. Schedule inspections through CAP system. 7. Obtain final approval and permit close-out.
- How long does it take to get a building permit in Deerfield Beach, FL?
- Building permit processing times in Deerfield Beach, FL typically run Varies; check with city. Timelines can vary based on project complexity and current department workload.
- How do I schedule a building inspection in Deerfield Beach, FL?
- Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Deerfield Beach, FL via: CAP Government portal. Submit through CAP portal.
Need help with your project?
Navigating permits in Deerfield Beach can be complicated.
Jaspector connects you with local experts who can review your scope, verify your contractor, and help you understand what permits your project actually needs.
Learn how Jaspector worksOther cities in Broward County