jaspector
City building permits

City of Coconut Creek

How to apply for a building permit in City of Coconut Creek, Florida. Permit authority, application steps, fees, and inspection requirements.

Min. permit fee
Variable
Last verified
April 2026
On this page 6
§ 01

Permit authority

Building Division, Resilient Design and Development

Street address
4800 West Copans Road, Coconut Creek, FL 33063
Coverage
All properties within the incorporated City of Coconut Creek.
Online portal
ePermits
ePermits
§ 02

When a permit is required

Permit triggers and exempt work for Coconut Creek

A building permit is required for new construction and for alterations, replacements, removals, or modifications of existing structures involving structural, electrical, plumbing, and mechanical work.

Note: Confirm exemptions with city Building Division

Required documents
  • Completed permit application
  • Site plans and construction drawings
  • Proof of professional design (if required)
  • Structural calculations (if required)
Building code
Florida Building Code (FBC); Broward County Administrative Provisions
Permit validity
Check city code for permit expiration and renewal provisions
Owner-builder
Owner-builders must apply in person per city guidance.
Contractor requirements
Contractors must hold valid Florida construction licenses.

Source: Building Division, Resilient Design and Development ↗

§ 03

Application process

Typical processing: Variable; check with city for current plan-review timeline

  1. 01
    Determine permit type and requirements through city guidance.
  2. 02
    Prepare application documents and construction plans.
  3. 03
    Submit through ePermits portal (contractors) or in person (owner-builders).
  4. 04
    City reviews application for completeness.
  5. 05
    Pay permit fees.
  6. 06
    Schedule inspections and respond to plan-review comments.
  7. 07
    Obtain final inspection sign-off and permit close-out.

Typical processing time: Variable; check with city for current plan-review timeline

Source: Building Division, Resilient Design and Development ↗

§ 04

Fee schedule

Effective Check city website for current fee schedule

Fee type
Amount
01
Minimum permit fee
Variable
02
Plan check fee
Percentage of building permit fee
03
Permit fee formula
Based on construction valuation
04
Reinspection fee
Applied if required

Payment through ePermits or city cashier

Fees change periodically. Confirm at the official fee schedule ↗ (effective Check city website for current fee schedule) before budgeting.

§ 05

Required inspections

Scheduling and sequence

How to schedule
Scheduling deadline
Submit through portal or contact city
Inspection hours
Monday-Friday, standard business hours
Time windows
Confirm with city

Typical sequence: Standard Florida Building Code inspection sequence

Confirm with city if available

Source: Building Division, Resilient Design and Development ↗

§ 06

Frequently asked

Common questions about Coconut Creek permits

01 Do I need a building permit in Coconut Creek, FL?
A building permit is required for new construction and for alterations, replacements, removals, or modifications of existing structures involving structural, electrical, plumbing, and mechanical work.
02 How much does a building permit cost in Coconut Creek, FL?
Building permit fees in Coconut Creek, FL are set by the local building department and vary by project type and valuation. The minimum permit fee is Variable. Fees are calculated as: Based on construction valuation. Plan check fee: Percentage of building permit fee.
03 How do I apply for a building permit in Coconut Creek, FL?
To apply for a building permit in Coconut Creek, FL, follow these steps: 1. Determine permit type and requirements through city guidance. 2. Prepare application documents and construction plans. 3. Submit through ePermits portal (contractors) or in person (owner-builders). 4. City reviews application for completeness. 5. Pay permit fees. 6. Schedule inspections and respond to plan-review comments. 7. Obtain final inspection sign-off and permit close-out.
04 How long does it take to get a building permit in Coconut Creek, FL?
Building permit processing times in Coconut Creek, FL typically run Variable; check with city for current plan-review timeline. Timelines can vary based on project complexity and current department workload.
05 How do I schedule a building inspection in Coconut Creek, FL?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Coconut Creek, FL via: ePermits portal, City Building Division. Submit through portal or contact city.
last verified April 2026 source Building Division, Resilient Design and Development ↗ entry id permits/florida/broward/coconut-creek

Educational reference. Permit rules and fees change — confirm current requirements directly with Building Division, Resilient Design and Development before applying. Jaspector is not legal advice.