jaspector
City building permits

City of Pembroke Pines

How to apply for a building permit in City of Pembroke Pines, Florida. Permit authority, application steps, fees, and inspection requirements.

Avg processing
Varies; check portal for status
Min. permit fee
Variable
Last verified
April 2026
On this page 6
§ 01

Permit authority

Building Department

Street address
601 SW City Center Boulevard, Pembroke Pines, FL 33025
Coverage
All properties within the incorporated City of Pembroke Pines.
§ 02

When a permit is required

Permit triggers and exempt work for Pembroke Pines

A building permit is required for all construction and alterations in Pembroke Pines.

Note: Confirm exemptions with city Building Department

Required documents
  • Completed permit application
  • Construction plans and site plans
  • Structural calculations (if required)
  • Professional design certification (if required)
Building code
Florida Building Code 2023 8th Edition; Broward County Administrative Provisions
Permit validity
Check city code for expiration rules. City enforces 2023 FBC 8th Edition (effective with 2023 update).
Owner-builder
Owner-builders must comply with city requirements
Contractor requirements
Contractors must hold valid Florida construction licenses.

Source: Building Department ↗

§ 03

Application process

Typical processing: Varies; check portal for status

  1. 01
    Submit permit application through Development HUB / EnerGov platform.
  2. 02
    Attach construction plans and site documentation.
  3. 03
    City reviews for completeness and code compliance.
  4. 04
    Respond to plan-review comments if needed.
  5. 05
    Pay permit fees through portal.
  6. 06
    Manage permits and coordinate with departments through Development HUB.
  7. 07
    Schedule inspections and track progress.
  8. 08
    Obtain final approval and permit close-out.

Typical processing time: Varies; check portal for status

Source: Building Department ↗

§ 04

Fee schedule

Effective Check city website for current schedule

Fee type
Amount
01
Minimum permit fee
Variable
02
Plan check fee
Percentage of building permit fee
03
Permit fee formula
Based on construction valuation
04
Reinspection fee
Applied if required

Payment through Development HUB portal

Fees change periodically. Confirm at the official fee schedule ↗ (effective Check city website for current schedule) before budgeting.

§ 05

Required inspections

Scheduling and sequence

How to schedule
Scheduling deadline
Submit through portal
Inspection hours
Monday-Friday, standard business hours
Time windows
Confirm with city

Typical sequence: Standard Florida Building Code inspection sequence

Managed through Development HUB

Source: Building Department ↗

§ 06

Frequently asked

Common questions about Pembroke Pines permits

01 Do I need a building permit in Pembroke Pines, FL?
A building permit is required for all construction and alterations in Pembroke Pines.
02 How much does a building permit cost in Pembroke Pines, FL?
Building permit fees in Pembroke Pines, FL are set by the local building department and vary by project type and valuation. The minimum permit fee is Variable. Fees are calculated as: Based on construction valuation. Plan check fee: Percentage of building permit fee.
03 How do I apply for a building permit in Pembroke Pines, FL?
To apply for a building permit in Pembroke Pines, FL, follow these steps: 1. Submit permit application through Development HUB / EnerGov platform. 2. Attach construction plans and site documentation. 3. City reviews for completeness and code compliance. 4. Respond to plan-review comments if needed. 5. Pay permit fees through portal. 6. Manage permits and coordinate with departments through Development HUB. 7. Schedule inspections and track progress. 8. Obtain final approval and permit close-out.
04 How long does it take to get a building permit in Pembroke Pines, FL?
Building permit processing times in Pembroke Pines, FL typically run Varies; check portal for status. Timelines can vary based on project complexity and current department workload.
05 How do I schedule a building inspection in Pembroke Pines, FL?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Pembroke Pines, FL via: Development HUB portal. Submit through portal.
last verified April 2026 source Building Department ↗ entry id permits/florida/broward/pembroke-pines

Educational reference. Permit rules and fees change — confirm current requirements directly with Building Department before applying. Jaspector is not legal advice.