On this page 6
When a permit is required
Permit triggers and exempt work for Wright
A variety of permits are required for construction on new and existing structures within the Town limits.
Note: Exempt work governed by adopted building code (Title 9, Chapter 1). Wright Residential Building Requirements document (2020) available for construction standards in R-1 and R-1E zoning districts. Contact Town Hall at (307) 464-1666 for current exemption list.
- Completed Building Permit Application
- Site plan
- Contractor license documentation if using a licensed contractor
- Electrical or plumbing license documentation if applicable
- Voucher form (when applicable)
- Building code
- Title 9, Chapter 1 of the Wright Town Code (adopted by ordinance 2010-03 on March 8, 2010). Specific IBC/IRC edition not confirmed from publicly accessible sources.
- Permit validity
- Not published; contact Town Hall
- Owner-builder
- Not specified in publicly available documents; contact Town Hall
- Contractor requirements
- Contractors must be licensed by Town of Wright to protect local citizens. Contractor License New and Renewal Application forms available at https://www.wrightwyoming.com/forms_permits.php. Electrical and Plumbing license applications also available.
Source: Town of Wright — Building Official / Code Compliance ↗
Application process
Typical processing: Not published; contact Town Hall at (307) 464-1666
- 01 Contact Town Hall at (307) 464-1666 or visit during business hours (8 a.m. to 4:30 p.m., M-F) to confirm permit requirements for your project.
- 02 Download the Building Permit Application from https://www.wrightwyoming.com/_pdfs/forms_permits/Building_Permit_Application.pdf
- 03 If using a contractor, ensure the contractor is licensed with the Town of Wright (Contractor License application available on forms page).
- 04 Complete the application and gather required supporting documents.
- 05 Submit application in person at Town Hall along with applicable fee.
- 06 Building Official reviews the application.
- 07 Permit issued; post on job site.
- 08 Schedule required inspections with Building Official during construction.
- 09 Final inspection and sign-off.
Typical processing time: Not published; contact Town Hall at (307) 464-1666
Source: Town of Wright — Building Official / Code Compliance ↗
Fee schedule
Wright building permit fees
In-person payment at Town Hall; no online payment portal identified
Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.
Required inspections
Scheduling and sequence
- (307) 464-1666 (phone)
- buildingofficial@wrightwyoming.com (email)
- Inspection hours
- Monday-Friday, 8:00 AM to 4:30 PM
Typical sequence: Refer to Required Inspections document (available from Town Hall)
Source: Town of Wright — Building Official / Code Compliance ↗
Frequently asked
Common questions about Wright permits
01 Do I need a building permit in Wright, WY? ▸
02 How much does a building permit cost in Wright, WY? ▸
03 How do I apply for a building permit in Wright, WY? ▸
04 How long does it take to get a building permit in Wright, WY? ▸
05 How do I schedule a building inspection in Wright, WY? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Town of Wright — Building Official / Code Compliance before applying. Jaspector is not legal advice.