How to apply for a building permit in Town of Winthrop, Washington. Permit authority, application steps, fees, and inspection requirements.

Last verified
April 2026
On this page 6
§ 01

Permit authority

Building/Planning Department

Street address
206 Riverside Avenue, Winthrop, WA 98862
Coverage
All properties within the incorporated Town of Winthrop.
Online portal
Town of Winthrop Forms
Manual submission
§ 02

When a permit is required

Permit triggers and exempt work for Winthrop

A permit is required for construction, enlargement, alteration, repair, demolition, and system changes.

Note: Exempt work follows Washington State Building Code Section 105 exemptions. Contact the Town Planner to confirm requirements for any specific project.

Required documents
  • Building Permit Application
  • Site plan of the project
  • Construction plans/drawings
  • All other documents per application checklist
Building code
2021 International Building Code (IBC) with Washington amendments, 2021 International Residential Code (IRC), and related Washington State codes.
Permit validity
Permits are valid for six months from date of issuance. One six-month extension is available by written request if no plan changes are involved.
Contractor requirements
Contractor registration with Washington State L&I required. Electrical permits obtained separately through Washington State L&I. Business license required before Design Review Board review of any business project.

Source: Building/Planning Department ↗

§ 03

Application process

Typical processing: Processing time varies. Contact Town Hall for estimate.

  1. 01
    Obtain the Building Permit Application from townofwinthrop.com/forms.html.
  2. 02
    Ensure the property has a valid assigned address before submitting.
  3. 03
    Obtain a current Business License for any business operating within Winthrop before Design Review Board consideration.
  4. 04
    Submit completed application with required documents to Town Hall.
  5. 05
    Applications are reviewed by the Town Planner.
  6. 06
    Submit Water and Sewer service applications (may be completed before or after building permit issuance).
  7. 07
    Pay required fees.
  8. 08
    Permit issued upon approval; valid for six months from issuance.
  9. 09
    Permit extensions: one six-month extension available in writing if no plan changes are made.
  10. 10
    Schedule required inspections.

Typical processing time: Processing time varies. Contact Town Hall for estimate.

Source: Building/Planning Department ↗

§ 04

Fee schedule

Winthrop building permit fees

Fee type
Amount
01
Permit fee formula
Fees established by Town Council. A Land Use Fee Schedule is available from Town Hall.

Contact Town Hall at 509-996-2320 or planner@townofwinthrop.com for current building permit fee amounts.

§ 05

Required inspections

Scheduling and sequence

How to schedule
  • Town Hall: 509-996-2320 or Okanogan County: 509-422-7110 (phone)
  • pubwks@methow.com (email)
Scheduling deadline
For county inspections, call at least 24 hours in advance.
Inspection hours
Building/Permit hours: Thursday and Friday, 9:00 AM to 3:30 PM. Methow Valley county inspections: Wednesday and Friday.

Typical sequence: Building inspections may be conducted in coordination with Okanogan County. Typical sequence: Foundation/footings, Framing, Rough-in plumbing, Rough-in mechanical, Electrical rough-in (L&I, separate), Insulation, Final inspection.

Source: Building/Planning Department ↗

§ 06

Frequently asked

Common questions about Winthrop permits

01 Do I need a building permit in Winthrop, WA?
A permit is required for construction, enlargement, alteration, repair, demolition, and system changes.
02 How much does a building permit cost in Winthrop, WA?
Building permit fees in Winthrop, WA are set by the local building department and vary by project type and valuation. Fees are calculated as: Fees established by Town Council. A Land Use Fee Schedule is available from Town Hall..
03 How do I apply for a building permit in Winthrop, WA?
To apply for a building permit in Winthrop, WA, follow these steps: 1. Obtain the Building Permit Application from townofwinthrop.com/forms.html. 2. Ensure the property has a valid assigned address before submitting. 3. Obtain a current Business License for any business operating within Winthrop before Design Review Board consideration. 4. Submit completed application with required documents to Town Hall. 5. Applications are reviewed by the Town Planner. 6. Submit Water and Sewer service applications (may be completed before or after building permit issuance). 7. Pay required fees. 8. Permit issued upon approval; valid for six months from issuance. 9. Permit extensions: one six-month extension available in writing if no plan changes are made. 10. Schedule required inspections.
04 How long does it take to get a building permit in Winthrop, WA?
Building permit processing times in Winthrop, WA typically run Processing time varies. Contact Town Hall for estimate.. Timelines can vary based on project complexity and current department workload.
05 How do I schedule a building inspection in Winthrop, WA?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Winthrop, WA via: Town Hall: 509-996-2320 or Okanogan County: 509-422-7110, pubwks@methow.com. For county inspections, call at least 24 hours in advance..
last verified April 2026 source Building/Planning Department ↗ entry id permits/washington/okanogan/winthrop

Educational reference. Permit rules and fees change — confirm current requirements directly with Building/Planning Department before applying. Jaspector is not legal advice.