City Building Permits

Town of Bicknell, UT - 2026 Building Permit Guide

How to apply for a building permit in Town of Bicknell, Utah. Permit authority, application steps, fees, and inspection requirements.

Utah Wayne County Updated March 2026

Permit Authority

All construction within the incorporated boundaries of Bicknell.

Department
Bicknell Town Office / Town Council
Address
64 West 100 North, Bicknell, UT 84715
Phone
435-425-2215

Online Permit Portal

Platform: Paper-based • Account required: No • Submission: In-person only

Application Process

  1. Contact the Bicknell Town Office at 435-425-2215 or kelseybicknellutah@gmail.com to request the building permit application form and any current requirements checklist.
  2. Review the Town's Building Regulations Ordinance (Ordinance No. 10-6-2016), available at https://www.bicknellutah.com/ordinances.html.
  3. Prepare required construction documents: site plan and construction drawings appropriate to project scope.
  4. Complete the building permit application.
  5. If owner-building, prepare the notarized DOPL Owner/Builder Certification Agreement.
  6. Submit completed application and supporting documents to the town office in person.
  7. Await review and approval. Pay applicable permit fee.
  8. Receive issued permit. Post permit card on site; keep approved plans on site throughout construction.
  9. Schedule and pass all required inspections.
  10. Obtain final inspection approval and Certificate of Occupancy before occupying any new or substantially altered structure.

Source: Bicknell Town Office / Town Council

General Requirements

Any construction, addition, alteration, repair, demolition, relocation, or change of occupancy of a building or structure within Bicknell requires a building permit. The Town's Building Regulations Ordinance (No. 10-6-2016) governs permit requirements.

Required Documents

  • Completed building permit application
  • Site plan
  • Construction drawings
  • DOPL Owner/Builder Certification Agreement, if owner-builder
  • Contractor license verification, if licensed contractor
Permit validity
Statewide standard: permits expire if work does not commence within 180 days of issuance or is abandoned for 180 days after commencement. Confirm with the town office.
Building code
2021 IBC, 2021 IRC, 2021 IMC, 2021 IPC, 2021 IFGC, 2021 IECC, NEC 2020, per Utah Title 15A. Confirm whether Bicknell has adopted any local amendments by contacting the town office.
Owner-builder
Owner-builders are allowed under statewide law. Notarized DOPL Owner/Builder Certification Agreement is required with permit application.
Contractor requirements
Utah DOPL state license required for work valued at $3,000 or more.

Fees

Payment note
Bicknell does not publish a building permit fee schedule online. The Building Regulations Ordinance (No. 10-6-2016) likely contains the fee structure or delegates fee-setting to the Town Council by resolution. Contact the town office at 435-425-2215 for current fee information.

Work That Does NOT Require a Permit

Contact the Bicknell Town Office / Town Council to confirm whether your project requires a permit before starting work.

Inspections

How to Schedule

  • 435-425-2215 (phone)

Typical inspection sequence: Typical sequence: footings, foundation, rough-in (framing, electrical, plumbing, mechanical), insulation, and final inspection. If inspections are performed by the Wayne County Building Inspector, contact 435-836-1302.

Additional Resources

Information on this page was last verified: March 2026. Permit rules and fees change — confirm current requirements directly with the Bicknell Town Office / Town Council before applying.

Frequently Asked Questions

Town of Bicknell Building Permit FAQ

Do I need a building permit in Town of Bicknell, UT?
Any construction, addition, alteration, repair, demolition, relocation, or change of occupancy of a building or structure within Bicknell requires a building permit. The Town's Building Regulations Ordinance (No. 10-6-2016) governs permit requirements.
How do I apply for a building permit in Town of Bicknell, UT?
1. Contact the Bicknell Town Office at 435-425-2215 or kelseybicknellutah@gmail.com to request the building permit application form and any current requirements checklist. 2. Review the Town's Building Regulations Ordinance (Ordinance No. 10-6-2016), available at https://www.bicknellutah.com/ordinances.html. 3. Prepare required construction documents: site plan and construction drawings appropriate to project scope. 4. Complete the building permit application. 5. If owner-building, prepare the notarized DOPL Owner/Builder Certification Agreement. 6. Submit completed application and supporting documents to the town office in person. 7. Await review and approval. Pay applicable permit fee. 8. Receive issued permit. Post permit card on site; keep approved plans on site throughout construction. 9. Schedule and pass all required inspections. 10. Obtain final inspection approval and Certificate of Occupancy before occupying any new or substantially altered structure.
How do I schedule a building inspection in Town of Bicknell, UT?
Inspections can be scheduled via: 435-425-2215.

Need help with your project?

Navigating permits in Town of Bicknell can be complicated.

Jaspector connects you with local experts who can review your scope, verify your contractor, and help you understand what permits your project actually needs.

Learn how Jaspector works
Important: This page is an educational resource provided by jaspector.com. It is not legal advice, and it does not substitute for official guidance from the permit authority listed above. Permit requirements, fees, and processes change frequently. Always verify current requirements directly with the issuing department before beginning any construction project. Use of this page does not create an attorney-client relationship. Jaspector assumes no liability for any outcomes arising from reliance on this information.

Other cities in Wayne County

View all Wayne County jurisdictions →