When a permit is required
Permit triggers and exempt work for Redmond
Structures over 120 sq. ft. or with electrical or plumbing require a permit.
- Exempt Structures under 120 sq. ft. with no electrical or plumbing
- Exempt Like-for-like repairs not affecting structural, electrical, plumbing, or mechanical systems
- Municipality Zoning Permit (approved by town)
- Site plan
- Construction drawings
- Contractor license (if applicable)
- Owner-builder form (if applicable)
- Building code
- Utah statewide 2021 code package as adopted under Utah Code Title 15A.
- Permit validity
- Permits become null if work does not commence within 180 days of issuance.
- Owner-builder
- Owner-builder exemption available for primary residences under Utah Code Section 58-55-305.
- Contractor requirements
- Any work valued at $3,000 or more requires a Utah-licensed contractor unless the owner-builder exemption applies.
Application process
Typical processing: Varies; contact Sevier County at (435) 893-0420 for status.
- 01 Contact Redmond Town Hall at (435) 529-3278 to confirm zoning requirements and local regulations.
- 02 Complete the Municipality Zoning Permit form and obtain Redmond Town approval.
- 03 Submit the building permit application online via CityInspect with the approved zoning permit and all required construction documents.
- 04 Await Sevier County plan review and approval.
- 05 Receive the issued permit. Post permit card visibly on site.
- 06 Schedule inspections at least 24 hours in advance.
- 07 Obtain final inspection before occupancy.
Typical processing time: Varies; contact Sevier County at (435) 893-0420 for status.
Source: Redmond Town Hall; Building permits issued by Sevier County Building Department ↗
Fee schedule
Redmond building permit fees
Building permit fees are set by Sevier County. Contact county at (435) 893-0420. Redmond Town may assess local fees. Contact town hall at (435) 529-3278.
Required inspections
Scheduling and sequence
- CityInspect portal (online)
- (435) 893-0420 (phone)
- Scheduling deadline
- At least 24 hours notice required.
Typical sequence: Standard Sevier County inspection sequence applies.
Frequently asked
Common questions about Redmond permits
01 Do I need a building permit in Redmond, UT? ▸
02 How do I apply for a building permit in Redmond, UT? ▸
03 How long does it take to get a building permit in Redmond, UT? ▸
04 What work is exempt from building permits in Redmond, UT? ▸
05 How do I schedule a building inspection in Redmond, UT? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Redmond Town Hall; Building permits issued by Sevier County Building Department before applying. Jaspector is not legal advice.