jaspector
City building permits

City of Monroe

How to apply for a building permit in City of Monroe, Utah. Permit authority, application steps, fees, and inspection requirements.

Last verified
April 2026
On this page 6
§ 01

Permit authority

Monroe City Hall; Building permits issued by Sevier County Building Department

Coverage
Monroe City handles zoning review and municipal code enforcement. Building permits are issued by Sevier County Building Department.
Online portal
CityInspect
CityInspect
§ 02

When a permit is required

Permit triggers and exempt work for Monroe

All new construction, additions, and alterations affecting structure, mechanical, electrical, or plumbing require a permit. Structures over 120 sq. ft. require a permit.

Structures under 120 sq. ft. with no electrical or plumbing
Like-for-like repairs not affecting structural, electrical, plumbing, or mechanical systems
  • Exempt Structures under 120 sq. ft. with no electrical or plumbing
  • Exempt Like-for-like repairs not affecting structural, electrical, plumbing, or mechanical systems
Required documents
  • Monroe City Zoning Permit (approved by city)
  • Site plan
  • Construction drawings
  • Contractor license (if applicable)
  • Owner-builder form (if applicable)
Building code
Utah statewide 2021 code package as adopted under Utah Code Title 15A.
Permit validity
Permits become null if work does not commence within 180 days of issuance.
Owner-builder
Owner-builder exemption available for primary residences under Utah Code Section 58-55-305.
Contractor requirements
Any work valued at $3,000 or more requires a Utah-licensed contractor unless the owner-builder exemption applies.
§ 03

Application process

Typical processing: Varies; contact Sevier County at (435) 893-0420 for status.

  1. 01
    Contact Monroe City Hall at (435) 527-4621 to confirm zoning requirements, permitted uses, setbacks, and local regulations.
  2. 02
    Complete the Monroe City Zoning Permit form and have Monroe City officials review and approve it.
  3. 03
    Submit the building permit application online via CityInspect with the approved Monroe City Zoning Permit attached and all required construction documents.
  4. 04
    Await Sevier County plan review and approval.
  5. 05
    Receive the issued permit. Post permit card visibly on site before work begins.
  6. 06
    Schedule inspections at least 24 hours in advance via CityInspect or by calling Sevier County Building Department at (435) 893-0420.
  7. 07
    Obtain final inspection before occupying any new structure.

Typical processing time: Varies; contact Sevier County at (435) 893-0420 for status.

Source: Monroe City Hall; Building permits issued by Sevier County Building Department ↗

§ 04

Fee schedule

Monroe building permit fees

Fee type
Amount
01
Penalty (no permit)
Double permit fee if work begins before permit is obtained

Building permit fees are set by Sevier County. Contact county at (435) 893-0420. Monroe City may assess separate impact fees or zoning application fees. Contact Monroe City Hall at (435) 527-4621.

§ 05

Required inspections

Scheduling and sequence

How to schedule
Scheduling deadline
At least 24 hours in advance.

Typical sequence: Same as Sevier County standard sequence: footing, foundation, rough framing and trades, insulation, drywall, exterior work, final.

§ 06

Frequently asked

Common questions about Monroe permits

01 Do I need a building permit in Monroe, UT?
All new construction, additions, and alterations affecting structure, mechanical, electrical, or plumbing require a permit. Structures over 120 sq. ft. require a permit.
02 How do I apply for a building permit in Monroe, UT?
To apply for a building permit in Monroe, UT, follow these steps: 1. Contact Monroe City Hall at (435) 527-4621 to confirm zoning requirements, permitted uses, setbacks, and local regulations. 2. Complete the Monroe City Zoning Permit form and have Monroe City officials review and approve it. 3. Submit the building permit application online via CityInspect with the approved Monroe City Zoning Permit attached and all required construction documents. 4. Await Sevier County plan review and approval. 5. Receive the issued permit. Post permit card visibly on site before work begins. 6. Schedule inspections at least 24 hours in advance via CityInspect or by calling Sevier County Building Department at (435) 893-0420. 7. Obtain final inspection before occupying any new structure.
03 How long does it take to get a building permit in Monroe, UT?
Building permit processing times in Monroe, UT typically run Varies; contact Sevier County at (435) 893-0420 for status.. Timelines can vary based on project complexity and current department workload.
04 What work is exempt from building permits in Monroe, UT?
Not all construction work requires a permit in Monroe, UT. The following work is generally exempt: Structures under 120 sq. ft. with no electrical or plumbing; Like-for-like repairs not affecting structural, electrical, plumbing, or mechanical systems. When in doubt, confirm with the local building department before starting work.
05 How do I schedule a building inspection in Monroe, UT?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Monroe, UT via: CityInspect portal, (435) 893-0420. At least 24 hours in advance..

Educational reference. Permit rules and fees change — confirm current requirements directly with Monroe City Hall; Building permits issued by Sevier County Building Department before applying. Jaspector is not legal advice.