City Building Permits
Herriman, UT - 2026 Building Permit Guide
How to apply for a building permit in Herriman, Utah. Permit authority, application steps, fees, and inspection requirements.
Permit Authority
Applies inside Herriman City only.
- Department
- Building Department, Herriman City
- Address
- 5355 W Herriman Main St, Herriman, UT 84096
- Phone
- 801-446-5327
- building@herriman.gov
Application Process
- Review Herriman's Building and Building Permits pages.
- Select the applicable permit application and project page from city building resources.
- Submit permit application materials and supporting documents to the city.
- Coordinate any owner-builder declaration or permit transfer requirements if applicable.
- Pay fees per master fee schedule and building payment rules.
- Schedule inspections by phone before 4:00 p.m.
Typical processing time: No fixed review time clearly posted.
General Requirements
Most construction work requires a permit and inspections by the Building Department.
Required Documents
- Permit application materials for selected project type
- Owner-builder declaration when applicable
- Project-specific forms and submittal pages
- Permit validity
- Not clearly posted.
- Building code
- Herriman provides a Building Codes and Design Criteria page and administers Utah-adopted codes with city requirements.
- Owner-builder
- Herriman has a dedicated Owner/Builder Declaration page.
- Contractor requirements
- Utah licensing applies; city materials emphasize licensed teams and code compliance.
Fees
- Plan check fee
- Confirm in current fee schedule.
- Permit fee formula
- See master fee schedule PDF.
- Payment note
- Payments over $1,000 may be made by phone with electronic check; $1,000 and less can be made with Visa, Mastercard, Discover, or American Express.
Fees change. Verify current amounts at the official fee schedule.
Work That Does NOT Require a Permit
- Fences up to 7 feet high, subject to clear-view and taller-fence rules
- Swings and playground equipment for residence
- Decks with walking surface up to 30 inches above finished ground, unless serving required exit or triggering code/zoning review
- One-story detached garages, sheds, playhouses, pergolas, similar buildings 200 square feet or less, unless utilities added
- Prefabricated above-ground swimming pools not exceeding 2 feet depth
- Portable spa with cord and plug, not hard-wired
- Window awnings projecting no more than 54 inches
- Repair/maintenance of electrical and mechanical systems, except furnace, AC, water heater
- Adding a layer of shingles, subject to city reroof limits
Inspections
How to Schedule
- 801-446-5327 before 4:00 p.m. (phone)
- Scheduling deadline
- Before 4:00 p.m.
- Inspection hours
- 7:30 a.m. to 5:30 p.m. Monday-Friday
Typical inspection sequence: Permit-specific inspections coordinated by Building Department until final approval.
Additional Resources
- Building code: Herriman provides a Building Codes and Design Criteria page and administers Utah-adopted codes with city requirements.
- Verify contractor license: Utah DOPL License Lookup
- Zoning information: View zoning info
- Building FAQs
- Building Codes and Design Criteria
- License lookup guide: Utah Contractor License Requirements
- Contract template: Utah Homeowner-Contractor Agreement
- Utah hub: Utah Contractor License & Permit Hub
Information on this page was last verified: March 2026. Permit rules and fees change — confirm current requirements directly with the Building Department, Herriman City before applying.
Frequently Asked Questions
Herriman Building Permit FAQ
- Do I need a building permit in Herriman, UT?
- Most construction work requires a permit and inspections by the Building Department.
- How much does a building permit cost in Herriman, UT?
- Fees are calculated as: See master fee schedule PDF.. Plan check fee: Confirm in current fee schedule..
- How do I apply for a building permit in Herriman, UT?
- 1. Review Herriman's Building and Building Permits pages. 2. Select the applicable permit application and project page from city building resources. 3. Submit permit application materials and supporting documents to the city. 4. Coordinate any owner-builder declaration or permit transfer requirements if applicable. 5. Pay fees per master fee schedule and building payment rules. 6. Schedule inspections by phone before 4:00 p.m.
- How long does it take to get a building permit in Herriman, UT?
- Typical processing time is No fixed review time clearly posted..
- What work is exempt from building permits in Herriman, UT?
- The following work is generally exempt: Fences up to 7 feet high, subject to clear-view and taller-fence rules; Swings and playground equipment for residence; Decks with walking surface up to 30 inches above finished ground, unless serving required exit or triggering code/zoning review; One-story detached garages, sheds, playhouses, pergolas, similar buildings 200 square feet or less, unless utilities added; Prefabricated above-ground swimming pools not exceeding 2 feet depth; Portable spa with cord and plug, not hard-wired; Window awnings projecting no more than 54 inches; Repair/maintenance of electrical and mechanical systems, except furnace, AC, water heater; Adding a layer of shingles, subject to city reroof limits.
- How do I schedule a building inspection in Herriman, UT?
- Inspections can be scheduled via: 801-446-5327 before 4:00 p.m.. Before 4:00 p.m..
Need help with your project?
Navigating permits in Herriman can be complicated.
Jaspector connects you with local experts who can review your scope, verify your contractor, and help you understand what permits your project actually needs.
Learn how Jaspector worksOther cities in Salt Lake County
View all Salt Lake County jurisdictions →